ASX ANNOUNCEMENT 29 JANUARY 2019
Reconnaissance Gold Exploration Programme Green Dam Project
• Air Core Drilling: 49 holes for 1,104m completed to test gold in soil anomaly at the Green Dam Project
• Airborne Magnetic Survey: An airborne magnetics survey was completed over the entire Green Dam Project as an aide to structural interpretation and targeting
Air Core Drilling Programme
An aircore drilling programme was completed at the Green Dam Project during 2018. The drilling was designed to test a regionally extensive "gold in soil" anomaly in the southern area (Flanker prospect) of the Project (previously reported in December 2017 Quarterly Report).
This anomaly trends in a NW direction and is highlighted by elevated gold values exceeding 5ppb Au (up to a maximum of 35ppb Au) over an area of approximately 3km by 1.5km. This prospect is located 18km to the east of the 1.1M oz Bombora Gold Deposit (Breaker Resources). There are several other gold and nickel anomalies that remain untested within the Green Dam Project tenure.
The initial testing of this southern anomaly was completed using broad spaced air core drilling (600m x 100m). A total of 49 holes for 1,104m covering four drill traverses were completed during the quarter. The best results from this drilling are outlined in Table 1.
Company Snapshot
ASX Code: Shares on Issue: Share Price:
Market Capitalisation:
E25 84M $0.165 $13.9MBoard of Directors: Seamus Cornelius Justin Brown John RibbonsChairman ED
NED
Element 25 Limited is developing the world class Butcherbird manganese project in Western Australia to produce high purity manganese sulphate for lithium ion batteries and electrolytic manganese metal.
Element 25 Limited P +61 8 6315 1400
Level 2, 45 Richardson Street, West Perth, WA, 6005
Eadmin@e25.com.au element25.com.au
PO Box 910 West Perth WA 6872 Australia
Hole_ID | From | To | Interval | Au (ppb) | Comments |
GDAC0022 | 40 | 48 | 8 | 55 | EOH = 60m |
GDAC0025 | 16 | 24 | 8 | 244 ppb EOH | Incl 3m @ 581ppb Au |
GDAC0041 | 16 | 29 | 13 | 113 ppb EOH |
Table 1:
Significant Results returned from Green Dam aircore drilling. It is unknown whether the holes are true width. Assays were completed by Minanalytical in Perth using Aqua Regia digest and ICP-MS finish.
Figure 1: Green Dam aircore drilling programme collar location plan over surface geology.
Hole ID | Easting (GDA94, Z51) | Northing (GDA94, Z51) | RL | Dip | Azimuth | Total Depth (m) |
GDAC0001 | 477504 | 6599475 | 367 | -60 | 270 | 10 |
GDAC0002 | 477606 | 6599473 | 368 | -60 | 270 | 11 |
GDAC0003 | 477706 | 6599473 | 370 | -60 | 270 | 7 |
GDAC0004 | 477805 | 6599474 | 371 | -60 | 270 | 2 |
GDAC0005 | 477906 | 6599471 | 373 | -60 | 270 | 5 |
GDAC0006 | 478006 | 6599466 | 372 | -60 | 270 | 6 |
GDAC0007 | 478103 | 6599472 | 369 | -60 | 270 | 13 |
GDAC0008 | 478204 | 6599486 | 366 | -60 | 270 | 22 |
GDAC0009 | 478297 | 6599487 | 365 | -60 | 270 | 22 |
GDAC0010 | 476806 | 6600195 | 356 | -60 | 270 | 36 |
GDAC0011 | 476904 | 6600202 | 357 | -60 | 270 | 25 |
GDAC0012 | 476999 | 6600193 | 360 | -60 | 270 | 19 |
GDAC0013 | 477099 | 6600192 | 362 | -60 | 270 | 11 |
GDAC0014 | 477199 | 6600188 | 363 | -60 | 270 | 11 |
GDAC0015 | 477300 | 6600198 | 364 | -60 | 270 | 5 |
GDAC0016 | 477399 | 6600197 | 363 | -60 | 270 | 1 |
GDAC0017 | 477498 | 6600191 | 362 | -60 | 270 | 5 |
GDAC0018 | 477603 | 6600195 | 360 | -60 | 270 | 6 |
GDAC0019 | 477699 | 6600196 | 58 | -60 | 270 | 8 |
GDAC0020 | 477801 | 6600192 | 358 | -60 | 270 | 9 |
GDAC0021 | 477892 | 6600193 | 358 | -60 | 270 | 29 |
GDAC0022 | 476500 | 6600805 | 353 | -60 | 270 | 60 |
GDAC0023 | 476602 | 6600808 | 354 | -60 | 270 | 50 |
GDAC0024 | 476700 | 6600802 | 357 | -60 | 270 | 9 |
GDAC0025 | 476803 | 6600802 | 354 | -60 | 270 | 24 |
GDAC0026 | 476899 | 6600802 | 351 | -60 | 270 | 2 |
GDAC0027 | 477008 | 6600804 | 349 | -60 | 270 | 18 |
GDAC0028 | 477095 | 6600803 | 347 | -60 | 270 | 15 |
GDAC0029 | 477201 | 6600812 | 346 | -60 | 270 | 32 |
GDAC0030 | 477303 | 6600790 | 345 | -60 | 270 | 30 |
GDAC0031 | 477394 | 6600790 | 345 | -60 | 270 | 43 |
GDAC0032 | 477500 | 6600802 | 344 | -60 | 270 | 33 |
GDAC0033 | 477589 | 6600797 | 344 | -60 | 270 | 45 |
GDAC0034 | 476000 | 6601400 | 342 | -60 | 270 | 84 |
GDAC0035 | 476103 | 6601397 | 344 | -60 | 270 | 41 |
GDAC0036 | 476203 | 6601408 | 345 | -60 | 270 | 23 |
GDAC0037 | 476301 | 6601408 | 346 | -60 | 270 | 24 |
GDAC0038 | 476400 | 6601398 | 348 | -60 | 270 | 35 |
GDAC0039 | 476504 | 6601404 | 349 | -60 | 270 | 23 |
GDAC0040 | 476606 | 6601408 | 350 | -60 | 270 | 5 |
GDAC0041 | 476704 | 6601405 | 348 | -60 | 270 | 29 |
GDAC0042 | 476797 | 6601396 | 348 | -60 | 270 | 14 |
Element 25 Limited | Level 2, 45 Richardson Street, |
P +61 8 6315 1400 | West Perth, WA, 6005 |
Eadmin@e25.com.au | PO Box 910 West Perth WA 6872 |
element25.com.au | Australia |
Hole ID | Easting (GDA94, Z51) | Northing (GDA94, Z51) | RL | Dip | Azimuth | Total Depth (m) |
GDAC0043 | 476905 | 6601396 | 346 | -60 | 270 | 15 |
GDAC0044 | 477003 | 6601385 | 344 | -60 | 270 | 8 |
GDAC0045 | 477097 | 6601409 | 342 | -60 | 270 | 28 |
GDAC0046 | 477205 | 6601386 | 340 | -60 | 270 | 26 |
GDAC0047 | 477300 | 6601415 | 337 | -60 | 270 | 28 |
GDAC0048 | 477396 | 6601415 | 336 | -60 | 270 | 48 |
GDAC0049 | 477499 | 6601398 | 335 | -60 | 270 | 49 |
Table 2:Green Dam aircore drilling collar locations and details.
Airborne Magnetic Survey
An airborne magnetics survey was completed of the entire Green Dam Project as an aide to structural interpretation and targeting.
The survey was flown at a nominal 100m line spacing and 40m sensor height. The survey collected both magnetic and radiometric data sets with the following instrumentation:
Magnetometer
Geometrics GR823 tail sensor; mounted in a stinger housing.
• Sensor Type: | Caesium vapour |
• Resolution: | 0.001 nT |
• Sensitivity: | 0.01 nT |
• Sample Rate: | 20 Hz (≈3.5 metre sample interval) |
• Compensation: | 3-axis fluxgate magnetometer |
Gamma-Ray Spectrometer
RSI RS-500 gamma-ray spectrometer, incorporating 2x RSX-4 detector packs.
• Total Crystal Vol.: 32 L (downward-looking)
• Channels: 1024
• Sample Rate: 2Hz
• Multi-peak automatic gain stabilisation
Figure 2: Green Dam TMI Aeromagnetic image.
Element 25 Limited | Level 2, 45 Richardson Street, |
P +61 8 6315 1400 | West Perth, WA, 6005 |
Eadmin@e25.com.au | PO Box 910 West Perth WA 6872 |
element25.com.au | Australia |
Justin Brown
Executive Director
Company information, ASX announcements, investor presentations, corporate videos and other investor material on the Company's projects can be viewed at:http://www.element25.com.au.
Competent Persons Statement
The information in this report that relates to Exploration Results, Exploration Targets, Mineral Resources and Mineral Reserves is based on information compiled by Mr Justin Brown who is a member of the Australasian Institute of Mining and Metallurgy. At the time that the Exploration Results, Exploration Targets, Mineral Resources and Mineral Reserves were compiled, Mr Brown was an employee of Element 25 Limited. Mr Brown is a geologist and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Brown consents to the inclusion of this information in the form and context in which it appears in this report
Please note with regard to exploration targets, the potential quantity and grade is conceptual in nature, that there has been insufficient exploration to define a Mineral Resource and that it is uncertain if further exploration will result in the determination of a Mineral Resource.
The information in this report that relates to Mineral Resources is based on information announced to the ASX on 12 October 2017. Element 25 confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcements, and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed.
Element 25 Limited | Level 2, 45 Richardson Street, |
P +61 8 6315 1400 | West Perth, WA, 6005 |
Eadmin@e25.com.au | PO Box 910 West Perth WA 6872 |
element25.com.au | Australia |
Attachments
- Original document
- Permalink
Disclaimer
Element 25 Ltd. published this content on 29 January 2019 and is solely responsible for the information contained herein. Distributed by Public, unedited and unaltered, on 29 January 2019 08:53:06 UTC