Teranga Gold Corporation

Sabodala-Massawa Project

Pre-feasibility Study

National Instrument 43-101 Technical Report

5139-GREP-000

August 21, 2020

Sabodala-Massawa Project

Pre-feasibility Study

National Instrument 43-101 Technical Report

DATE & SIGNATURE PAGE

Project Name:

Sabodala-Massawa Project

Title of Report:

NI 43-101 Technical Report

Location:

Senegal

Date of Report:

21 August 2020

[SIGNATURES ON FILE]

DATE

Manochehr Oliazadeh, P.Eng. (Lycopodium Minerals Canada Ltd.)

21 August 2020

Sindy Cheng, P.Eng. (Lycopodium Minerals Canada Ltd.)

21 August 2020

James Christopher Lane, RpGeo AIG, RPEQ, MAusIMM, CGeol. (L&MGS Pty Ltd)

21 August 2020

Graham E. Trusler, MSc, Pr Eng, MiChe, MSAIChE (Digby Wells Environmental Ltd.)

21 August 2020

Patti Nakai-Lajoie, P.Geo. (Teranga Gold Corporation)

21 August 2020

Stephen Ling, P.Eng. (Teranga Gold Corporation)

21 August 2020

Sabodala-Massawa Project

Pre-feasibility Study

National Instrument 43-101 Technical Report

5139-GREP-000

Table of Contents

Page

1.0

SUMMARY

1.1

1.1

Introduction

1.1

1.2

Project Ownership and Location

1.1

1.3

History

1.2

1.3.1

Sabodala Property

1.2

1.3.2

Massawa Property

1.3

1.3.3

Past Production at Sabodala

1.3

1.4

Geology and Mineralization

1.4

1.5

Exploration Status

1.6

1.6

Mineral Resources

1.6

1.7

Mineral Reserves

1.10

1.8

Mining

1.12

1.8.1

Open Pit Mining

1.12

1.8.2

Underground Mining

1.13

1.8.3

LOM Production Schedule

1.13

1.9

Metallurgy

1.17

1.10

Process Plant

1.18

1.11

Services and Infrastructure

1.22

1.11.1

Existing Infrastructure

1.22

1.11.2

Power Supply

1.23

1.11.3

Water Supply

1.23

1.11.4

Tailings Storage Facility

1.24

1.11.5

Site Water Management

1.24

1.11.6

Accommodation

1.25

1.12

Environmental and Social Impact

1.26

1.13

Capital and Operating Costs

1.27

1.13.1

Capital Costs

1.27

1.13.2

Operating Costs

1.29

1.14

Economic Analysis

1.31

1.15

Conclusions and Recommendations

1.33

1.15.1

Conclusions

1.33

1.15.2

Recommendations

1.34

2.0

INTRODUCTION

2.1

2.1

Report Background and Contributors

2.1

2.2

Authors and Responsibilities

2.2

513916.045139-GREP-001_0 - aaTOC

August 2020

Lycopodium

Sabodala-Massawa Project

Pre-feasibility Study

National Instrument 43-101 Technical Report

5139-GREP-000

Table of Contents

Page

2.3

Site Visits

2.2

2.4

Declaration

2.3

2.5

Abbreviations

2.4

3.0

RELIANCE ON OTHER EXPERTS

3.1

3.1

Legal Standing of Tenement

3.1

4.0

PROPERTY DESCRIPTION AND LOCATION

4.1

4.1

Property Location

4.1

4.2

Land Tenure

4.2

4.2.1

Sabodala Mining Concession

4.4

4.2.2

Sabodala Regional Land Package

4.4

4.2.3

Massawa Mining License

4.7

4.2.4

Massawa Regional Land Package

4.7

4.3

Existing Environmental Liabilities

4.7

5.0 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND

PHYSIOGRAPHY

5.1

5.1

Physiography

5.1

5.2

Accessibility

5.1

5.3

Climate

5.1

5.4

Surface Rights for Mining Operations, Water, Power and Labour

5.1

6.0

HISTORY

6.1

6.1

Sabodala Property

6.1

6.2

Massawa Property

6.4

6.3

Past Production at Sabodala

6.13

7.0

GEOLOGICAL SETTING

7.1

7.1

Regional Geology

7.1

7.1.1

Regional Structural Setting

7.3

7.1.2

Regional Surficial Geology

7.5

7.2.2

Sabodala Mining Concession

7.7

7.2.3

Massawa Mining License

7.17

7.2.5

Bransan Lot A Permit

7.34

7.2.6

Bransan Lot C Permit

7.35

513916.045139-GREP-001_0 - aaTOC

August 2020

Lycopodium

Sabodala-Massawa Project

Pre-feasibility Study

National Instrument 43-101 Technical Report

5139-GREP-000

Table of Contents

Page

7.2.7

Sounkounkou Permit

7.37

7.2.8

Massawa Exploration Permit

7.40

8.0

DEPOSIT TYPES

8.1

9.0

EXPLORATION

9.1

9.1

Introduction

9.1

9.2

Exploration Approach

9.1

9.3

Exploration Status

9.3

9.4

January 2016 to December 2019 Exploration

9.5

9.4.1

Sabodala Mining Concession

9.5

9.4.2

Regional Land Package (RLP)

9.7

9.5

Exploration Potential

9.9

10.0

DRILLING

10.1

10.1

Summary

10.1

10.1

Drilling Methods - Teranga

10.2

10.1.1

Reverse Circulation Drilling

10.3

10.1.2

Diamond Drilling

10.3

10.1.3

Rotary Air Blast Drilling

10.4

10.1.4

Data Management

10.5

10.2

Drilling Methods Barrick/Randgold

10.5

10.2.1

Reverse Circulation Drilling

10.5

10.2.2

Diamond Drilling

10.7

10.2.3

Other Drilling Methods

10.7

10.2.4

Data Management

10.7

10.3

Sabodala Mining Concession

10.7

10.3.1

January 2016 to December 2019

10.16

10.4

Massawa Mining License and Exploration Permit

10.18

10.5

Sabodala Regional Land Package (RLP)

10.24

10.5.1

January 2016 to December 2019

10.26

11.0

SAMPLING PREPARATION, ANALYSES AND SECURITY

11.1

11.1

Introduction

11.1

11.2

Sample Preparation

11.1

11.2.1

Sabodala

11.1

513916.045139-GREP-001_0 - aaTOC

August 2020

Lycopodium

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Endeavour Mining plc published this content on 29 November 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 29 November 2021 12:00:06 UTC.