Endeavour Silver Corp. reported production results for the first quarter ended March 31, 2025. Consolidated silver production was 1,205,793 ounces in first quarter of 2025, in line with plan and 17% lower than first quarter of 2024.
Lower silver production was driven by 24% lower silver production at the Guanaceví mine, partially offset by 53% higher silver production at the Bolañitos mine compared to the same quarter in 2024. Consolidated gold production was 8,338 ounces in first quarter of 2025, 18% lower than first quarter of 2024 due to 28% lower gold production at the Bolañitos mine, and 3% lower gold production at the Guanaceví mine.