Well 7018/5-1 will be drilled from the West Hercules drilling facility in position 70-degree40'25.86'N and 18-degree26'48.19'E after concluding the drilling of wildcat well 6407/1-8 S for
The drilling programme for well 7018/5-1 relates to the drilling of a wildcat well in production licence 960.
The area in this licence consists of parts of blocks 7018/4 and 7018/5. The well will be drilled about 100 kilometres southwest of the Snohvit field.
Production licence 960 was awarded on
The permit is contingent on the operator securing all other permits and consents required by other authorities prior to commencing the drilling activity.
Contact:
Tel: +47 51 87 61 00
(C) 2020 Electronic News Publishing, source