Eramet: 2024 targets lowered for manganese and nickel
As a result, the mining and metallurgical group's target for manganese ore volumes produced and transported in 2024 has been revised to between 6.5 and 7 million tonnes (compared with 7 to 7.5 million tonnes previously).
PT WBN's external nickel ore volume target has been revised to 29 million wet tons in 2024, of which two-thirds will be high-grade saprolite and one-third laterite (compared with 40 to 42 million previously).
Copyright (c) 2024 CercleFinance.com. All rights reserved.
Go to the original article.
Contact us to request a correction