European Metals Holdings Limited

ARBN 154 618 989

Suite 12, Level 1

11 Ventnor Avenue West Perth WA 6005 PO Box 52

West Perth WA 6872 Phone + 61 8 6141 3500

Fax + 61 6141 3599

Website: www.europeanmet.com

Directors

David Reeves

Non-Executive Chairman

Keith Coughlan

Managing Director

Dr Pavel Reichl

Non-Executive Director

Kiran Morzaria

Non-Executive Director

Company Secretary

Ms Julia Beckett

Corporate Information

ASX: EMH AIM: EMH

Frankfurt: E861.F CDIs on Issue: 129M

2 May 2017 GRANT OF PERMITS

European Metals Holdings Limited ("European Metals" or "the Company") (ASX & AIM: EMH) is pleased to announce the recent granting of three key permits in the development of the Cinovec Lithium/Tin Project in the Czech Republic.

HIGHLIGHTS
  • The Preliminary Mining Permit covering the majority of the Cinovec Project has been awarded by the Czech Ministry of Environment.
  • A further Exploration Licence has been granted for the ground immediately south of the main deposit.
  • A de-watering permit has been obtained from the Ohře River Authority to pump out the historic workings.
PRELIMINARY MINING PERMIT

As announced to the market on 3 February 2017, the Cinovec South Resource was formally added to the Czech State resource register, which was the first step in the process of the granting of a mining permit. As a next step, the 'Preliminary Mining Permit' (PMP) has now been received. The permit covers approximately 1,500,000 m2 of the Cinovec deposit south area (see Figure 1) and is valid until April 2025. The Company has until that date to submit an application for the final mining permit and which it intends to do well before then. The granting of the PMP means that the regulatory oversight for the designated area is transferred from the Ministry of Environment to the Czech Mining Bureau which approves the final mining plan and delimits the final mining space. Both approvals are predicated on the results of an Environmental Impacts Analysis, which the Company has commenced.

ADDITIONAL EXPLORATION LICENCE

The Company has been awarded an additional exploration licence for the ground immediately south of the deposit (see Figure 1). Securing this area allows the Company to begin preparatory geotechnical work for the exploration adit, including excavation of the adit itself when appropriate.

DE-WATERING PERMIT

The historic Cinovec mine was closed in 1989 and the shafts were capped. Since that time, the workings have been partially flooded. The Company has been working with environmental consultants and relevant local authorities to secure the necessary permits to begin de-watering the mine well in advance of commencing operations. The initial permit has been received and the Company will now finalise the de- watering process. The Company aims to de-water the mine as part of the Definitive Feasibility Study to allow detailed geological, geotechnical and hydrological studies of the deposit. Accessing the underground workings will also allow collecting representative samples for pilot scale lithium carbonate production, which will be used to supply potential off-take customers.

European Metals Managing Director Keith Coughlan commented, "It is very pleasing to receive all of these permits and the licence in a clear and timely fashion. As there has been limited commissioning of new mining operations in the Czech Republic in recent times, the time line for the permitting process has not been specifically determined. The awarding of these permits increases our confidence in the future timing of operations and illustrates the support that development of the Cinovec Project enjoys in the Czech Republic."

Figure 1: Location of Current Operational Permits Over the Cinovec Project BACKGROUND INFORMATION ON CINOVEC PROJECT OVERVIEW Cinovec Lithium/Tin Project

European Metals owns 100% of the Cinovec lithium-tin deposit in the Czech Republic. Cinovec is an historic mine incorporating a significant undeveloped lithium-tin resource with by-product potential including tungsten, rubidium, scandium, niobium and tantalum and potash. Cinovec hosts a globally significanthard rock lithium deposit with a total Indicated Mineral Resource of 348Mt @ 0.45% Li2O and 0.04% Sn and an Inferred Mineral Resource of 309Mt @ 0.39% Li2Oand 0.04% Sn containing a combined 7.0 million tonnes Lithium Carbonate Equivalent and 263kt of tin.

This makes Cinovec the largest lithium deposit in Europe, the fourth largest non-brine deposit in the world and a globally significant tin resource.

The deposit has previously had over 400,000 tonnes of ore mined as a trial sub-level open stope underground mining operation.

The recently completed Preliminary Feasibility Study, conducted by specialist independent consultants, returned a post tax NPV of USD540m and an IRR of 21%. It confirmed the deposit is be amenable to bulk underground mining. Metallurgical test work has produced both battery grade lithium carbonate and high-grade tin concentrate at excellent recoveries. Cinovec is centrally located for European end-users and is well serviced by infrastructure, with a sealed road adjacent to the deposit, rail lines located 5 km north and 8 km south of the deposit and an active 22 kV transmission line running to the historic mine. As the deposit lies in an active mining region, it has strong community support.

The economic viability of Cinovec has been enhanced by the recent strong increase in demand for lithium globally, and within Europe specifically.

CONTACT

For further information on this update or the Company generally, please visit our website at www. http://europeanmet.com or contact:

Mr. Keith Coughlan Managing Director COMPETENT PERSON

Information in this release that relates to exploration results is based on information compiled by European Metals Director Dr Pavel Reichl. Dr Reichl is a Certified Professional Geologist (certified by the American Institute of Professional Geologists), a member of the American Institute of Professional Geologists, a Fellow of the Society of Economic Geologists and is a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves and a Qualified Person for the purposes of the AIM Guidance Note on Mining and Oil & Gas Companies dated June 2009. Dr Reichl consents to the inclusion in the release of the matters based on his information in the form and context in which it appears. Dr Reichl holds CDIs in European Metals.

The information in this release that relates to Mineral Resources and Exploration Targets has been compiled by Mr Lynn Widenbar. Mr Widenbar, who is a Member of the Australasian Institute of Mining and Metallurgy, is a full time employee of Widenbar and Associates and produced the estimate based on data and geological information supplied by European Metals. Mr Widenbar has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the JORC Code 2012 Edition of the Australasian Code for Reporting of Exploration Results, Minerals Resources and Ore Reserves. Mr Widenbar consents to the inclusion in this report of the matters based on his information in the form and context that the information appears.

CAUTION REGARDING FORWARD LOOKING STATEMENTS

Information included in this release constitutes forward-looking statements. Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as "may", "will", "expect", "intend", "plan", "estimate", "anticipate", "continue", and "guidance", or other similar words and may include, without limitation, statements regarding plans, strategies and objectives of management, anticipated production or construction commencement dates and expected costs or production outputs.

Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the company's actual results, performance and achievements to differ

materially from any future results, performance or achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project development, including the risks of obtaining necessary licences and permits and diminishing quantities or grades of reserves, political and social risks, changes to the regulatory framework within which the company operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues and litigation.

Forward looking statements are based on the company and its management's good faith assumptions relating to the financial, market, regulatory and other relevant environments that will exist and affect the company's business and operations in the future. The company does not give any assurance that the assumptions on which forward looking statements are based will prove to be correct, or that the company's business or operations will not be affected in any material manner by these or other factors not foreseen or foreseeable by the company or management or beyond the company's control.

Although the company attempts and has attempted to identify factors that would cause actual actions, events or results to differ materially from those disclosed in forward looking statements, there may be other factors that could cause actual results, performance, achievements or events not to be as anticipated, estimated or intended, and many events are beyond the reasonable control of the company. Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, in providing this information the company does not undertake any obligation to publicly update or revise any of the forward looking statements or to advise of any change in events, conditions or circumstances on which any such statement is based.

LITHIUM CLASSIFICATION AND CONVERSION FACTORS

Lithium grades are normally presented in percentages or parts per million (ppm). Grades of deposits are also expressed as lithium compounds in percentages, for example as a percent lithium oxide (Li2O)content or percent lithium carbonate (Li2CO3) content.

Lithium carbonate equivalent ("LCE") is the industry standard terminology for, and is equivalent to, Li2CO3. Use of LCE is to provide data comparable with industry reports and is the total equivalent amount of lithium carbonate, assuming the lithium content in the deposit is converted to lithium carbonate, using the conversion rates in the table included below to get an equivalent Li2CO3 value in percent. Use of LCE assumes 100% recovery and no process losses in the extraction of Li2CO3 from the deposit.

Lithium resources and reserves are usually presented in tonnes of LCE or Li. The standard conversion factors are set out in the table below:

Table: Conversion Factors for Lithium Compounds and Minerals

Convert from

Convert to Li

Convert toLi2O

Convert toLi2CO3

Lithium

Li

1.000

2.153

5.324

Lithium Oxide

Li2O

0.464

1.000

2.473

Lithium Carbonate

Li2CO3

0.188

0.404

1.000

WEBSITE

A copy of this announcement is available from the Company's website at www.europeanmet.com.

European Metals Holdings Ltd. published this content on 01 May 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 01 May 2017 22:48:15 UTC.

Original documenthttp://europeanmet.com/assets/02052017_-_EMH_-_Grant_of_Permits_Final.pdf

Public permalinkhttp://www.publicnow.com/view/2DFD09F7F7FBED8FB7D17A3D5DCB71362D7B34F6