European Metals Holdings Limited announced that Measured Resource drilling has commenced at the Cinovec Lithium-Tin Project ("the project" or "Cinovec"). The Company can confirm that drilling has commenced and that the first hole, CIS-18, is on schedule for completion at 275 metres. The programme commenced following the Company receiving permission from the statutory authorities in the Czech Republic for this year's planned diamond drilling campaign. Drilling is aimed at converting a sufficient portion of the existing Indicated Mineral Resource to the Measured Resource category and subsequently to a Mineral Reserve, to cover the first two years of the scheduled mining plan and obtaining a sufficient amount of ore samples for the next phase of metallurgical testing. The majority of the material will be utilised in the pilot scale testing for the Front End Engineering Design ("FEED") Study. A total of nineteen diamond drill holes will be completed for 5,550 metres. A further four geotechnical holes along the planned underground decline route will be drilled and logged subsequent to the completion of the resource drilling. This data will allow final development ready designs to be completed for the declines.