European Metals Holdings Limited announced initial results from its current nineteen hole resource drilling programme at the Cinovec Project. The current programme of work was announced by the Company on 10 August 2020 (Measured Resource Drilling Commenced). Drilling of twelve of the nineteen holes has been completed and the thirteenth hole is currently underway. Analytical results for the first six of the drill holes from the Cinovec South deposit are reported. Given the relative ease of beneficiation of the Cinovec deposit through wet magnetic separation it was decided that it was important to report the drill results and the "in lab" beneficiation results. As reported to the market 21 October 2016 (Outstanding Lithium Recoveries at Coarse Grind) wet magnetic separation ("WMS") achieved a near pure lithium mica concentrate grading 2.85% Li2O with a lithium recovery of 92%. Resource drill holes CIS-18, CIS-19, CIS-20, CIS-21, CIS-22 and CIS-23 have been completed including analytical reports. Resource drill holes CIS-24, CIS-25, CIS-26, CIS-28, CIS-29 and CIS-30 have been drilled with analytical results pending. Drilling of resource hole CIS-27 is currently underway. Hole CIS-18 returned 57m averaging 0.41% Li2O, incl. 5m @ 0.96% Li2O, 3 m @ 1.13% Li2O, 0.12% Sn (Tin) and 0.104% W (Tungsten), and 7 m @ 0.136% W. Hole CIS-19 returned 68.9m averaging 0.45% Li2O and 0.11% Sn, incl. 10.8m @ 0.75% Li2O, 10m @ 0.13% Sn, 2.25m @ 0.54% Li2O, 0.15% Sn and 0.13% W, 4m @ 0.95% Sn, and 2m @ 0.15% Sn. Hole CIS-20 returned 82.8m averaging 0.41% Li2O, incl. 8.9m @ 0.66% Li2O. Hole CIS-21 returned 76.3m averaging 0.55% Li2O, incl. 12m @ 0.81% Li2O. Hole CIS-22 returned 115.5m averaging 0.47% Li2O, incl. 3m @ 0.91% Li2O and 3m @ 0.87% Li2O, and 28m @ 0.27% Sn. Hole CIS-23 returned 98.6m averaging 0.51% Li2O, incl. 9.7m @ 0.92% Li2O, 1m @ 1.49% Li2O, and 2.9m @ 1.31% Li2O.