Fission Uranium Corp. announced scintilometer results from the summer 2021 "metallurgical & geotechnical testwork" drilling on the R840W zone at its' PLS project, in the Athabasca Basin region of Saskatchewan, Canada. Four metallurgical holes and three geotechnical holes were completed as part of the Phase 1 feasibility study field work. All seven holes intersected mineralization with all four metallurgical and two geotechnical holes intersecting wide intervals of strong mineralization. They follow the recently announced, highly successful resource expansion drilling on the zone that hit high-grade mineralization in nineteen holes. Of particular note, hole PLS21-MET-004 (line 615W) intersected 50.3m of continuous mineralization, including28.5m of total composite radioactivity >10,000 cps(with a peak of 65,500 cps). Assays are pending. The metallurgical and geotechnical testwork drilling at the R840W is part of the data collection in anticipation that the R840W zone will be included in the Feasibility Study.