Forum Energy Metals Corp. announced that it has commenced drilling on its 100% owned Wollaston Uranium Project, located 10km southeast of Cameco's Rabbit Lake mill and 30km southeast of Orano/Denison's McClean Lake mill. Plans are to drill approximately 3,000 metres in 10 to 12 drill holes on the targets developed on the western side of the project, most within 3km of Highway 905.

The Wollaston project is located just outside the margin of the overlying Athabasca sandstone and is prospective for basement-hosted unconformity style uranium deposits such as Cameco's Eagle Point mine and NexGen's Arrow deposit. Gravity crews have completed surveys on the main target areas to be drill tested. These surveys detect alteration halos surrounding potential uranium deposits associated with structures outlined by electromagnetic (EM) conductors.