Forum Energy Metals Corp. updated shareholders with a review of the Company's exploration plans on its uranium, copper, nickel and palladium projects in Saskatchewan and its cobalt project in Idaho. Forum has submitted permit applications for drilling on five of its nine drill-ready uranium projects in the prolific Athabasca Basin, Saskatchewan ? Wollaston (100% Forum), Highrock (100% Forum), Costigan (65% Forum; 35% Trafigura), Clearwater (75% Forum; 25% Vanadian) and Northwest Athabasca Joint Venture (39.5% Forum; 28% NexGen; 20% Cameco; 12.5% Orano). Arrangements for a 3,000 metre drill program on the Wollaston project located within 10km of Cameco's Rabbit Lake uranium mill and within 30km of Orano/Denison's McClean Lake uranium mill are well underway for a mid-January, 2022 startup. Permitting and preliminary planning are underway at the Clearwater, Costigan and Highrock projects due to option and joint venture interest from third parties in these projects. Forum will start organizing the mobilization of camp and equipment in the New Year for a winter 2023 drilling campaign at the Northwest Athabasca Basin Joint Venture project, host to the historical 1.5 million pound Maurice Bay uranium deposit, based on 600,000 tonnes grading 0.6% U3O8 to a depth of 50 metres in the Western Athabasca Basin. A drill is currently located on the property.