Galan Lithium Limited announced a revised JORC (2012) reported Mineral Resource estimate for the Hombre Muerto West lithium brine project located in Catamarca province, Argentina. The resource estimate was completed by the Company's consultants SRK Consulting (Australasia) (SRK) and was conducted by their Australian based team. The initial Hombre Muerto West resource estimate was updated by SRK on 22 June 2020 to include the acquisition of the Deceo III concession, adjacent to the Pata Pila licence area and the resource estimate was re-classified from Inferred to Indicated. SRK have now updated the HMW resource based on the recent acquisition of the Del Condor concession and a review of specific yield values used in the resource calculations. The key HMW concessions have been combined to produce a total indicated resource of approximately 2.3 million tonnes of contained lithium carbonate equivalent (LCE) product grading at 946mg/l Li (with no Li cut off). A summary of the HMW mineral resource, is provided in the Mineral Resource Statement. The mineral resource estimation was undertaken by SRK Consulting (Australasia) (SRK) and was based upon results from drill holes within the Pata Pila, Deceo III and Rana de Sal tenement holdings at Hombre Muerto West for a total of 1,054 metres. The hydrogeologic domains were constrained by logged units within both holes and from interpretation of ten geophysical profiles (controlled source audio-frequency magnetotellurics [CSMAT]) The mineral resource estimates undertaken by SRK were determined for lithium and potassium. Lithium is reported as lithium carbonate (Li2CO3) equivalent, and potassium as potassium chloride (KCI). The Hombre Muerto West (HMW) Project is located on the western shores of the Hombre Muerto, a world-renowned lithium bearing salar, located in the Argentinean Puna plateau region of the high Andes mountains at an elevation of approximately 4 km above sea-level. The HMW Project comprises six exploration areas (Catalina and Pucara not included in HMW resource), covering a total estimated polygon area of 7.5km strike, up to 2.5km in width and up to 718m in depth. It lies adjacent to Livent Corporation, Galaxy Resources and POSCO's Sal de Vida projects. It is approximately 1,400 km northwest of the capital of Buenos Aires and 170 km west-southwest of the city of Salta (in a straight line).