Paris - January 11th, 2022. GTT announces that it has received, at the end of December 2021, an order fromits partner the Korean shipyard Hyundai Samho Heavy Industries for the tank designof a new LNGC[1].

As part of this order, GTT will design the tanks of the 174,000 m3 LNGC. The LNGC tanks will be fitted with the GTTMark III Flexmembrane containment system.

Delivery of the vessel is scheduled for the third quarter of 2024.

Media contact:
press@gtt.fr/mlbouchon@three-sixty-advisory.com/ +33 (0)6 31 62 23 48

Investor Relations contact:
information-financiere@gtt.fr/ + 33 (0)1 30 23 20 87

>Download in .pdf

[1]Liquefied Natural Gas Carrier

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

GTT – Gaztransport & Technigaz SA published this content on 11 January 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 11 January 2022 16:57:07 UTC.