GTT will design the tanks of these two vessels, which will each offer a capacity of 174,000 m3. The tanks will be fitted with the NO96 L03+membrane containment system developed by GTT.
The delivery of the vessels is scheduled for the fourth quarter of 2025 and the first quarter of 2026.
Media contact:
press@gtt.fr/ +33 (0)1 30 23 48 45
Investor Relations contact:
information-financiere@gtt.fr/ + 33 (0)1 30 23 20 87
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
GTT – Gaztransport & Technigaz SA published this content on 20 September 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 20 September 2022 15:59:06 UTC.