Geopacific Resources Ltd. provided an update on its recently concluded exploration drilling campaign at the Woodlark Gold Project. The results of the 2022 drilling campaign have now all been received and reported. Highlights: Resource extension drilling and rheological test work holes at Busai and Kulumadau delivered positive near surface results (all within 100m of surface) including: BSSTG001 with 91 metres at 2.64 g/t Au from 40 metres, including 3 metres at 6.57/t Au from 53 metres, 3 metres at 6.84 g/t Au from 64 metres, 1 metre at 25.40 g/t Au from 76 metres, 1 metre at 14.47 g/t Au from 87 metres, 1 metre at 6.79 g/t Au from 100 metres, 1 metre at 22.20 g/t Au from 119 metres and 1 metre at 5.71 g/t Au from 125 metres; KURC22054 with 24 metres at 1.85 g/t Au from 104 metres, including 1 metre at 8.70 g/t Au from 109 metres, 1 metre at 6.41 g/t Au from 111 metres, 1 metre at 3.01 g/t Au from 117 metres and 2 metres at 3.61 g/t Au from 121 metres; KURC22060 with 24 metres at 3.94 g/t Au from 31 metres, including 3 metres at 17.82 g/t Au from 44 metres; KURC22067 with 3 metres at 14.34 g/t Au from 70 metres, including 1 metre at 39.55 g/t Au from 70 metres; KULSTG003 with 17 metres at 3.03 g/t Au from 38 metres, including 1 metre at 14.35 g/t Au from 41 metres and 2 metres at 10.64 g/t Au from 43 metres.

These results were not available at the time of the preparation of the recently reported Mineral Resource update 1 for the project and will be incorporated into future resource updates.