THE SAWAYAERDUN GOLD DEPOSIT
GOBIMIN INC. & XINJIANG TONGYUAN MINERALS LTD
Job No. 2020_G Mining One Pty Ltd
Doc No. 4208v1.doc
Date: 7 January 2016 Prepared by: Bin Guo
FINAL REPORT - 07/01/2016
Level 9, 50 Market Street
Melbourne VIC 3000
Ph: 03 9600 3588
Fax: 03 9600 3944
Mr Bin Guo
Level 9, 50 Market St, Melbourne, Victoria, Australia Phone +61 421 176 099
bguo@miningone.com.au
I, Bin Guo, am working as a Geologist with Mining One Pty Ltd of Level 9, 50 Market St Melbourne, Victoria, Australia. This certificate applies to the Mineral Resource Technical Report on the Sawayaerdun Gold Project, Xinjiang, China prepared for GobiMin Inc. dated 16th April 2015 (Updated 7th January 2016), do hereby certify that:
I am a registered member of the Australian Institute of Geoscientists (AIG)
I am a graduate of Changchun College of Geology and hold a B App Sc in Geology, which was awarded in 1992.
I have had over 15 years' experience within the mining and exploration industry both in relation to technical roles and the corporate assessment and financing side of the industry. My experience covers exposure to numerous gold projects and gained an understanding of drilling, sampling, geological interpretation and resource modelling aspects. My experience enables me to sign off to the NI43-101 and JORC 2012 guidelines for most gold and base metal projects.
I am a Qualified Person for the purposes of the National Instrument 43-101 of the Canadian Securities Administrators (NI43-101).
I am responsible for the preparation and supervision and final editing of all sections of the technical report.
I have no prior involvement in the property that is the subject of this report. I completed a site visit to the project between the 12th October 2014 and the 14th October 2014 and visited the assay laboratory in Shanshan on the 15th October 2014.
To the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading. I am not aware of any material fact or material change with respect to the subject matter of the Technical Report that is not reflected in the Technical Report, the omission to disclose which makes the Technical Report misleading.
I am independent of GobiMin Inc. in accordance with the application of Section 1.4 of the NI43- 101 guidelines.
I have read the NI43-101 guidelines and Form 43-101F1 and the Technical Report has been prepared in compliance with that instrument and form.
I consent to the public filing of the Technical Report with any stock exchange or any other regulatory authority and any publication by them for regulatory purposes, including electronic publication in the public company files on their website and accessible by the public, of the Technical Report. I have read the document and confirm that it fairly and accurately represents the information in the Technical Report.
Dated at Beijing this 16th of April 2015 (Updated 7th January 2016)
"Bin Guo" (QP)
P:2020_G4208v8_Jan16_v3 i
EXECUTIVE SUMMARY vii
INTRODUCTION 1
Background 1
Source Information 1
Limitations 1
Mining Factors 2
Capability and Independence 2
RELIANCE ON OTHER EXPERTS 3
Overview 3
PROPERTY LOCATION AND DESCRIPTION 4
Summary 4
Deposit Location 4
Project Ownership 5
ACCESSIBILITY, CLIMATE & INFRASTRUCTURE 7
Project Access 7
Geography and Climate 7
Hydrological Conditions 7
Local Climatic Conditions 7
Seismicity 7
Local Economy and Infrastructure 7
EXPLORATION HISTORY 8
Exploration Activities 8
Mining History 8
Technical Studies 9
GEOLOGICAL SETTING AND MINERALISATION 10
Summary 10
Regional Geology 10
Local Geology 10
Mineralization and Deposit Type 12
DRILLING 14
Drilling Data 14
Drill Collar and Down-hole Surveys 15
Diamond Drill Core Processing & Recovery 15
Diamond Drill Core Logging 16
2014 Drilling 16
2014 Drilling Results 18
SAMPLE PREPARATION & ANALYSIS 20
Assay Laboratory 20
Sample Preparation 20
Sample Transport & Security 20
Assaying Methods 20
QAQC PROTOCOLS & RESULTS 21
P:2020_G4208v8_Jan16_v3 ii
Site and Laboratory QAQC 21
Laboratory Repeat Sampling 23
Independent Duplicate Sampling 25
Overall Reliability of Samples 26
DATA VERIFICATION AND SELECTION 27
Data Overview 27
Data Selection 27
Overall Data Verification Assessment 27
DENSITY DATA 28
Density Measurement Database 28
Coding of Density Data into Model 28
MINERAL RESOURCE ESTIMATION 29
Previous Estimates 29
Source Data Files 29
Mined Void Modeling 30
Geological & Mineralized Domain Modeling 30
Compositing 32
Grade Capping 36
West IV Domain Top Cut Analysis 37
Variography & Estimation Search Parameters 37
Block Model Construction 40
Estimation Technique 42
Oxidation Surface Coding 42
Resource Classification 42
Estimation Results 44
Dilution and Ore Losses 44
Grade Tonnage Curve 46
RESOURCE MODEL VALIDATION 47
Wireframe vs Block Model Volume Check 47
Composite Assays vs Block Grades 47
Visual Checking of Block Grades vs Raw Assay Data 48
Spatial Comparison of Composite Values vs Block Grades 49
RESOURCE UPSIDE & EXPLORATION POTENTIAL 50
Resource Upside Targets 50
Exploration Potential Targets 50
MINERAL PROCESSING AND METALLURGICAL TESTING 52
Metallurgical Overview 52
Metallurgical Testwork 52
Metallurgical Conclusions 54
OTHER RELEVANT DATA AND INFORMATION 55
Other Data 55
Project Risks 55
Recommendations 56
REFERENCES 57
12.9.1 Grade Interpolation Parameters 42
P:2020_G4208v8_Jan16_v3 iii
GobiMin Inc. issued this content on 2016-01-20 and is solely responsible for the information contained herein. Distributed by Public, unedited and unaltered, on 2016-01-21 02:49:05 UTC
Original Document: http://www.gobimin.com/i/pdf/2016/Reports/20160120_Amended & restated technical report (NI 43-101).pdf