Highlights:
The updated Indicated resource for the Sao Jorge deposit ('Deposit') is estimated to total 19.42 million tonnes ('Mt') at an average grade of 1.00 gram per tonne gold ('g/t Au') containing approximately 624,000 ounces ('oz') gold.
An additional 5.56 Mt at an average grade of 0.72 g/t Au containing approximately 129,000 oz Au is estimated in the Inferred resource category.
The MRE is reported within a 'Base Case' conceptual pit design shell for the Deposit using a long-term average gold price of
A series of nested conceptual pit shells within the 'Base Case' indicates the potential for a high-grade starter pit that contains an Indicated resource of 2.1 Mt at 1.89 g/t Au.
The Sao Jorge deposit occupies less than 0.1% of the Company's land holdings by area, that occurs within an emerging and expanding mineral system defined by a 12 km x 7 km footprint of elevated surface geochemical anomalies surrounding the Deposit, thereby highlighting the broader exploration potential of the Project.
On a regional scale, the Company has also expanded its land package to 46,485 hectares ('ha') by acquiring an additional 488.45 ha located to the east of the Deposit.
The Company is planning follow-up drilling programs for the 2025 field season to systematically explore high priority targets within the Sao Jorge mineral system where numerous high-grade auger drill intercepts were made in the 2024 drill program:
High-grade auger drill intercepts at 'William South' in 2024 included 1 metre ('m') at 17.14 g/t Au, 1 m at 10.20 g/t Au, 1 m at 8.01 g/t Au and 5 m at 2.78 g/t Au, all from depths of less than 15 m below surface.
Recent soil sampling has returned the highest ever gold-in-soil anomaly of 5.96 g/t Au at the 'William North' prospect area.
Alastair Still, Chief Executive Officer of GoldMining, commented: 'The Company is more encouraged than ever by the exploration potential at Sao Jorge which has been supported by additional soil sampling and auger drilling and an updated mineral resource estimate. Sao Jorge's proximity to existing infrastructure, significant property size and location within an emerging gold producing district make it an increasingly important asset for the Company. We have backed up our confidence in the potential of the Project by acquiring claims to expand our land package and we are developing plans for a 2025 exploration campaign that will double our 2024 activities. Our 2024 drilling program at Sao Jorge improved the underlying geological model as well as our understanding of the controls on gold mineralization. This work served to ensure improved confidence in our Sao Jorge pit constrained MRE, which now is predominantly classified as Indicated resources. The Sao Jorge deposit remains open in all directions and we are very encouraged by the potential to expand the MRE at Sao Jorge given the recent excellent exploration results across the Project.'
Updated Sao Jorge Deposit Mineral Resource Estimate
The updated MRE incorporates the 2024 drilling results, revised geological interpretation within the Deposit and refreshed cut-off grade assumptions. The MRE is based on 43,573 meters of drill data available as of
The updated Sao Jorge MRE incorporates:
Information from three 2024 diamond core drill holes for 598.6 meters of drilling within the Deposit (SJD-120-24 to SJD-122-24), with revisions to the geological interpretation and three dimensional mineralization modelling (see Figure 2).
Revised geological modeling has incorporated the logging of 2024 drill core, the partial relogging of historic drill core, and surface mapping data, which cumulatively has aided to advance the understanding of the controls on the distribution of the gold mineralization within the Sao Jorge deposit.
Mineral resource reporting is constrained within a pit shell using refreshed cut-off grade assumptions.
The following table is a summary of the Sao Jorge 2025 MRE update.
Table 1: Mineral Resource Estimate for the Sao Jorge Deposit (Effective Date:
Tonnage
000 tonnes)
Grade
(g/t Au)
Contained Metal
(oz Au)
Total Indicated
19,418
1.00
624,000
Total Inferred
5,557
0.72
129,000
Notes:
1.
CIM (2014) definitions were followed for Mineral Resources.
2.
Mineral Resources are estimated at a break-even cut-off grade of 0.27 g/t Au for classified blocks above a constraining pit shell.
3.
Mineral Resources are estimated using a long-term gold price of
4.
A minimum mining width of five metres was used.
5.
There are no Mineral Reserves estimated at the
6.
Totals may not add due to rounding.
Sao Jorge Project Geology
Sao Jorge Project Exploration Opportunity and Upside
Deposit Scale
The 2024 diamond drilling program was successful in confirming the interpreted location of gold mineralization within the existing deposit and providing additional information to model the west-northwestern strike extension of the principal zone of mineralization, and also a parallel en echelon offset zone of mineralization which lies to the northwest of the main mineralized trend. Neither the strike extensions nor the depth limits of the Deposit have been well defined by drilling. The Company plans to undertake additional exploration activities to search for the possible strike extensions along the broader Sao Jorge deposit mineralized corridor, including further defining the extent of the en echelon mineralization in the northwestern zone of the Deposit. Follow-up drilling is also planned where 2024 drilling intersected gold mineralization in a previously untested zone located 1 kilometre to the west-northwest along strike of the Deposit (see news release dated
The Company's technical team observes that high Induced Polarization ('IP') chargeability values, associated with sulphide bearing zones, which may be associated with gold mineralization, are present along strike of, and to the south, of the Deposit. Only a small number of diamond drill holes have been completed outside of the existing Deposit to test these IP anomalies and the Company is planning to undertake additional geophysical surveying, modeling and target analysis with the objective to drill test high priority chargeability targets.
Mineral System Scale
Exploration activities carried out by the Company over the past two years has included a comprehensive program of surface geochemical sampling, including systematic soil grid sampling, and mapping and rock chip sampling programs over areas with outcropping bedrock geology or where bedrock is exposed in shallow artisanal mine workings, coupled with a multi-element assaying program. To date 7,238 soil samples have been collected of which currently 718 samples are awaiting assay, and also 1,119 rock grab samples have been collected of which 61 are awaiting assay. The surface sampling program has successfully delineated several new exploration targets comprising gold +/- copper +/- molybdenum +/- silver soil geochemical anomalies which cumulatively outlines a large mineral system defined by a 12 km x 7 km geochemical footprint surrounding the Deposit.
Additional soil-sampling is continuing to grow the geochemical footprint, with recent results including the highest grading soil anomaly sampled to date on the Project, a 5.96 g/t Au assay returned at the 'William North' target area (see Figure 3). This newly emerging anomaly at William North builds upon the emerging geochemical footprint over the Sao Jorge mineral system, which includes several robust anomalies including soil grids with values peaking at 3.48 g/t Au at the 'Eye' target and 2.16 g/t Au at 'William South'. These broad contiguous high-tenor soil anomalies are complimented by rock chip sampling of exposed bedrock which has returned values peaking at 26.34 g/t Au at William South and 6.66 g/t Au at William North.
Furthermore, an auger drilling program completed in 2024 at the William South area (see news releases dated
1 m at 17.14 g/t Au from 12 m depth,
5 m at 2.78 g/t Au from 10 m depth,
1 m at 10.2 g/t Au from 14 m depth,
1 m at 8.01 g/t Au from 6 m depth,
1 m at 3.78 g/t Au from 10 m depth; and
3 m at 1.05 g/t Au from 12 m depth.
These auger drilling results indicate that potential exists for the discovery of new gold mineralized zones hosted in deeper saprolite and fresh rock. The Company plans to undertake deeper reverse circulation ('RC') and/or diamond core drilling, to test beneath the high-grade gold mineralization discovered by the auger drilling program in the William South area. In addition, step-out auger drilling is planned to search for extensions of the recently identified gold-in-saprolite mineralization, plus auger drilling in new target areas to test beneath additional high tenor gold-in-soil anomalies, such as at William North (see Figure 3).
The Company is also pleased to announce that it successfully bid upon and was awarded mineral concession 850.745/2024 (see Figure 3), which creates greater continuity of land tenure across the potential eastern extension of the Sao Jorge mineral system. Concession 850.745/2024 comprises 488.45 ha, bringing the total Project land package to 46,485 ha.
Visit www.goldmining.com for more information, including high resolution figures and the Technical Report.
Qualified Persons
The technical work of the 2024 Sao Jorge MRE was completed by
About
Notice to Readers
Technical disclosure regarding Sao Jorge has been prepared by the Company in accordance with NI 43-101. NI 43-101 is a rule of the Canadian Securities Administrators which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. These standards differ from the requirements of the
Cautionary Statement on Forward-looking Statements
Certain of the information contained in this news release constitutes 'forward-looking information' and 'forward-looking statements' within the meaning of applicable Canadian and
(C) 2025 Electronic News Publishing, source
















