Golden Lake Exploration Inc. reported on an additional drill hole just received plus correct an error in the heading of today's earlier news release regarding its Jewel Ridge project near the town of Eureka in Nevada. The additional hole, JR-21-29 DD, came back with a new high-grade intercept of 5.43 m @ 5.13 g/t Au & 1.5 g/t Ag. This hole is open to the north with the intercept section beginning at the 156.70-meter level. Previously additional assay results from six (6) holes from the 2021 diamond drill program were announced, however the heading reported an interval of 66 meters of 1.1 g/t gold which was in error. The actual interval was 4.24 m @ 1.10 g/t Au plus 21 g/t Ag. Further drill hole assays remain pending. Drilling Quality assurance and quality control statement: Procedures have been implemented to assure QA/QC of drill hole assaying being done at an ISO accredited assay laboratory. All intervals of drill holes are being assayed and samples have been securely shipped and received by Paragon Geochemical in Sparks, Nevada, with chain-of-custody documentation through delivery. Mineralized commercial reference standards and coarse blank standards are inserted every 20th sample in sequence. All results will be analyzed for consistency.