GOLDEN LAKE EXPLORATION INC.

Management Discussion and Analysis

For the three months ended February 28, 2022

The Management Discussion and Analysis ("MD&A"), prepared April 18, 2022 should be read in conjunction with the condensed interim consolidated financial statements and notes thereto for the period ended February 28, 2022 and the notes thereto of Golden Lake Exploration Inc. ("Golden Lake") which were prepared in accordance with International Financial Reporting Standards.

Certain information in this MD&A, including all statements that are not historical facts, constitutes forwardlooking information within the meaning of applicable Canadian securities laws. Such forwardlooking information may include, but is not limited to, information which reflect management's expectations regarding the Company's future growth, results of operations (including, without limitation, future production and capital expenditures), performance (both operational and financial) and business prospects (including the timing and development of new deposits and the success of exploration activities) and opportunities. Often, this information includes words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate" or "believes" or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.

In making and providing the forwardlooking information included in this MD&A the Company's assumptions may include among other things: (i) assumptions about the price of metals; (ii) that there are no material delays in the optimization of operations at the exploration and evaluation assets; (iii) assumptions about operating costs and expenditures; (iv) assumptions about future production and recovery; (v) that there is no unanticipated fluctuation in foreign exchange rates; and (vi) that there is no material deterioration in general economic conditions. Although management believes that the assumptions made and the expectations represented by such information are reasonable, there can be no assurance that the forwardlooking information will prove to be accurate. By its nature, forwardlooking information is based on assumptions and involves known and unknown risks, uncertainties and other factors that may cause the Company's actual results, performance or achievements, or results, to be materially different from future results, performance or achievements expressed or implied by such forwardlooking information. Such risks, uncertainties and other factors include among other things the following: (i) decreases in the price of base metals; (ii) the risk that the Company will continue to have negative operating cash flow; (iii) the risk that additional financing will not be obtained as and when required; (iv) material increases in operating costs; (v) adverse fluctuations in foreign exchange rates; and (vi) environmental risks and changes in environmental legislation.

This MD&A (See "Risks and Uncertainties") and the Company's annual information form contain information on risks, uncertainties and other factors relating to the forwardlooking information. Although the Company has attempted to identify factors that would cause actual actions, events or results to differ materially from those disclosed in the forwardlooking information, there may be other factors that cause actual results, performances, achievements or events not to be anticipated, estimated or intended. Also, many of the factors are beyond the Company's control. Accordingly, readers should not place undue reliance on forwardlooking information. The Company undertakes no obligation to reissue or update forward looking information as a result of new information or events after the date of this MD&A except as may be required by law. All forwardlooking information disclosed in this document is qualified by this cautionary statement.

DESCRIPTION OF BUSINESS AND GOING CONCERN

Golden Lake Exploration Inc. ("the Company") was incorporated on May 17, 2018 under the laws of British Columbia. The address of the Company's corporate office and its principal place of business is Suite 1240 - 789 West Pender Street V6C 1H2, Vancouver, British Columbia, Canada.

The Company's principal business activities include the acquisition and exploration of mineral property assets. As at February 28, 2022, the Company had not yet determined whether the Company's mineral property asset contains ore reserves that are economically recoverable. The recoverability of amount shown for exploration and evaluation asset is dependent upon the discovery of economically recoverable reserves, confirmation of the Company's interest in the underlying mineral claims, the ability of the Company to obtain the necessary financing to complete the development of and the future profitable production from the property or realizing proceeds from its disposition. The outcome of these matters cannot be predicted at this time and the uncertainties cast significant doubt upon the Company's ability to continue as a going concern.

In March 2020, the World Health Organization declared coronavirus COVID-19 a global pandemic. This contagious disease outbreak, which has continued to spread, and any related adverse public health developments, has adversely affected workforces, economies, and financial markets globally, potentially leading to an economic downturn. It is not possible for the Company to predict the duration or magnitude of the adverse results of the outbreak and its effects on the Company's business or ability to raise funds.

EXPLORATION PROJECT

Jewel Ridge Project

The Company has acquired a 100% undivided interest in the Jewel Ridge Project (the "Property") located near Eureka in Nevada.

The Optionor has retained a 4% Net Smelter Returns ("NSR") royalty on the mining claims comprising the Property described as "GM Squared claims" under the Agreement. The Company has the right to purchase all of the NSR for $8,000,000. In addition, following the exercise of the option and acquisition of the Property, the Optionor shall reserve a royalty of 3% on NSR on the mining claims comprising the Property described as "Rainbow claims". The Company has the option, up to seven years, to purchase 2% of the royalty for $2,000,000. The Company shall pay to the Optionor advance royalty payments of $50,000 per annum payable forty-eight months after the closing date and such payments are to be deducted from any royalty payments payable under Rainbow claims.

On May 6, 2021, the Company announced that a Phase 2 diamond drill program has started on its keystone Jewel Ridge project, near Eureka, Nevada. The drill contractor is Big Sky Exploration, LLC, based in Bozeman, Montana, and supervision and support are supplied by a team of consulting and Company geologists and technicians. The proposed drill program of 20,000 feet (6,100 meters) will be augmented with a second rig later in the summer. The initial drill holes will be directed at the Carbonate Replacement Deposit ("CRD") bonanza mineralization intersected in hole JR-20-12DD which returned from 15.21 meters to 18.44 meters returned 3.23 meters averaging 57.16 g/t Au, 452.0 g/t Ag, 7.23 % Pb, and 11.99% Zn.

On May 27, 2021, the Company announced it has received approval from the BLM for its near-term proposed exploration and drill plan under a "Notice of Intent", which is limited to five acres of surface disturbance. EM Strategies, based in Reno, Nevada, assisted with the application. The planned surface disturbance included under this Notice consists of constructed drill sites including sumps,improvements to existing roads, and overland travel routes, with planned surface disturbance of approximately 2.49 acres, in the Eureka Tunnel target area. Under the Notice the Company has proposed 35 drill sites. The Eureka Tunnel target covers the carbonate replacement deposit (CRD) bonanza mineralization intersected in hole JR-20-12DD which returned from 15.21 metres to 18.44 metres returned 3.23 metres averaging 57.16 grams per tonne (g/t) gold (Au), 452.0 g/t silver (Ag), 7.23 per cent lead (Pb) and 11.99 per cent zinc (Zn).

On July 6, 2021, the Company reported on exploration activities on the company's keystone Jewel Ridge gold property located near the town of Eureka, Nevada.

Highlights:

  • Diamond drilling resumed on the Jewel Ridge property on May 6, 2021, on hole JR-21- 14DD. To date six holes have been completed (JR-21-14DD to JR-21-19DD) comprising 3,125 ft (952.5 meters). Drilling has focused on the Eureka Target on the northern portion of the property.

  • Assays for the first three holes (JR-21-14DD to JR-21-16DD) are expected within 7-10 days and will be reported when available.

  • • Two types of mineralization have been identified on the Eureka Target, included a tabular, shallow dipping zone of "Carlin-style" mineralization intersected in several recent drill holes, and the recently discovered Carbonate Replacement Deposit ("CRD" bonanza mineralization which returned 3.23 meters averaging 57.16 grams gold per tonne (g/t Au), 452.0 grams silver per tonne (g/t Ag), 7.23 percentage lead (% Pb) and 11.99 percentage zinc (% Zn). This high-grade interval in hole JR-20-12DD (vertical hole) was within a wider zone (combined with Carlin style mineralization) that averaged 9.16 g/t Au, 65.8 g/t Ag. 1.03 % Pb, and 1.90 % Zn over a drill interval of 24.54 meters.

  • • The Company has engaged EM Strategies, based in Reno, Nevada, for preparation and submission to the Bureau of Land Management ("BLM"), a comprehensive "Plan of Operation" ("PoO") over most of the Jewel Ridge property. The Jewel Ridge PoO represents a significant stage and asset for the company, as the baseline studies completed (biological, hydrological, and archeological) will be essential for any future development of a gold deposit on the Property. The PoO over the Property, and the larger disturbance allowance, will give the Company more flexibility in planning and permitting future drill sites. After the baseline study reports have been approved by the BLM, EM Strategies will submit the complete Plan to the BLM and Nevada Division of Environmental Protection (NDEP) Bureau of Mining Regulation and Reclamation (BMRR), which will include a description of the planned exploration activities and reclamation plan.

  • • The Company has recently completed a Lidar ("light detection and ranging) survey a remote sensing method that uses light in the form of a pulsed laser to measure ranges (variable distances) to generate precise, three-dimensional information about the surface characteristics of the project ground. The survey was completed by GSP Consulting / Synergy Mapping of Sparks, Nevada and the final product is expected within two weeks. The Lidar survey will be useful given the rugged and variable topography on the property and the multitude of historical workings and disturbances.

Highlights:

  • • Diamond drilling resumed on the Jewel Ridge property on May 6, 2021, on hole JR-21-14DD.

  • • To date, complete assays have been received for holes JR-21-14 DD, JR-21-15DD and JR-21-16DD (see table below). All three holes were collared close to (with 10 meters) of hole JR-20-12DD to determine the dip of the CRD zone and to test the width and continuity of the Carlin-style

mineralization. Hole JR-21-14DD was drilled to the southwest at -45 degrees and was lost at 37.2

meters. Hole JR-21-15 DD was drilled to the southwest at -70 degrees and ended at 175.3 meters. Hole 21-16DD was drilled at -70 degrees in a northeast direction to a depth of 201.8 meters. • In

hole JR-21-16DD the mineralized zone extends from 6.86 meters to 25.54 meters, over a core width of 18.68 meters averaging 5.85 g/t Au, 18.3 g/t Ag, 0.38 % Pb and 1.28 % Zn. A CRD section from a depth of 18.78 meters within this interval returned 1.98 meters averaging 5.93 g/t Au, 111.2 g/t Ag, 2.83 % Pb and 3.50 % Zn. A unit of jasperoid mineralization within the Carlin-style portion of the interval from a depth of 10.68 meters, over a width of 8.09 meters averaged 8.93 g/t Au, 9.4 g/t Ag, 0.12 % Pb, and 1.72 % Zn.

  • • Based on these initial results the CRD zone appears to be steeply dipping in a north-easterly direction, and the Carlin mineralization is a tabular zone, striking North-North-west with a shallow dip to the east.

On September 16, 2021, the Company reported a summary and detailed assay results from six additional diamond drill holes of the ongoing Phase 2 program on the "Eureka Target" on the

company's keystone Jewel Ridge gold property located near the town of Eureka, Nevada. All six holes have intersected a robust zone of "Carlin-style", oxide, significant gold mineralization incarbonates with the best intercept (based gold grade x thickness in meters) in hole JR-21-21DD which returned 39 meters from the collar averaging 1.07 g/t Au and 2.2 g/t Ag and the average over the six holes being 36 meters in thickness grading 0.81 grams gold per tonne (g/t Au) and 2.1 grams silver per tonne (g/t Au). To date, all intercepts of the Eureka Target start at surface, or at shallow depths and are targets for open-pit, heap-leachable gold operations. Hole JR-21-17DD intersected the thickest zone of gold mineralization at 47.9 meters averaging 0.42 g/t Au and 1.2 g/t Ag and returned anomalous gold values (+0.30 g/t Au) for a plus 110-meter interval.

Highlights:

  • • Diamond drilling continues on the Eureka Target on the north-central portion of the Jewel Ridge

property, with drilling currently active on hole JR-21-28 DD. All holes have been core drilled. To date, 14 holes have been drilled as part of the Phase 2 program, comprising 2,710 meters (8,890 ft).

  • • Hole JR-21-17DD is the most northern located hole with assays received and although lower in grade, it exhibits a much thicker zone (+110 meters) of anomalous gold mineralization than previously indicated on the Jewel Ridge property. From the collar at surface, to a depth of 110.3 meters, the Upper Mineralized one ("UMZ") averaged 0.32 g/t Au and 1.1 g/t Ag. Higher grade

intervals included 25.5 meters averaging 0.54 g/t Au and 1.6 g/t Ag from a depth of 39.0 meters, and 7.0 meters averaging 0.54 g/t Au and 0.9 g/t Ag from a depth of 79.9 meters. In addition, hole JR021-17DD intersected the Lower Mineralized Zone ("LMZ") returning 0.55 g/t AU and 3.2 g/t Ag over 5.1 meters from a depth of 255.1 meters.

  • • Based on drilling to date, the disseminated, "Carlin-style", oxide mineralization appears as a tabular zone, varying from 25 to 45 meters in thickness (with potential for +100 meters thickness), dipping shallowly to the east, and north-east. The Carbonate Replacement Deposit ("CRD") bonanza mineralization intersected in hole JR-20-12DD occurs within the disseminated oxide gold mineralized zone, and in places below it. Hole JR-21-22DD intersected a narrow (0.7 meter) CRD intercept approximately 7.2 meters below the UMZ which returned 0.94 g/t Au, 14.5 g/t Ag and 0.24% lead (Pb) and 0.78 % zinc (Zn). The delineation of the CRD targets are complicated by more extensive underground workings in the Eureka Target area than was previously known, with several holes terminated by encountering these underground workings.

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Golden Lake Exploration Inc. published this content on 26 April 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 26 April 2022 22:24:23 UTC.