Green Battery Minerals Inc. Provides Assay Results from 11 Diamond Drill Holes at the Berkwood Graphite Project
1,152 meters. Highlights of these holes include: BK1-46-22 - 51.2m (from 42.2m) at 22.61%, including 21m (from 43.7m) at 30.09%, and including 12.1m (from 75.3m) at 28.52%;
BK1-47-22 - 45.95m (from 66.05m) at 17.58%, including 9.05m (from 67.55m) at 26.26%,
and including 10.5m (from 100.7m) at 29.96%; BK1-50-22 - 36.1m (from 72.9m) at 18.46%, including 10.5m (from 75.9m) at 31.73% BK1-51-22 - 62m (from 47m) at 16.37%, including 9m (from 48.5m) at 29.71%, and including 12m (from 69.5m) at 27.68%; BK1-52-22 - 58m (from 50m) at 11.44%, including 9m (from 51.5m) at 28.85%; BK1-54-22 - 42.5m (from 43m) at 14.74% including 13m (from 44.5m) at 24.07%; and BK1-55-22 - 46.5m (from 56m) at 21.97% including 19.5m (from 80m) at 35.52%.