Group Ten Metals Inc. announced the arrival of the second drill rig at the Company's Stillwater West platinum group element, nickel, copper, cobalt, and gold project in Montana, USA, and provides an update on progress of the planned 10,000 meter 2021 drill campaign. Drilling is now underway in the Chrome Mountain target area, and a second rig will be installed in the Camp target area this week. The primary objective of the 2021 program is: 1) the expansion of existing drill-defined kilometer-scale nickel and copper sulphide mineralization, enriched in palladium, platinum, rhodium, gold and cobalt, at the advanced Chrome Mountain, Camp and Iron Mountain target areas; and 2) step-out testing of adjacent priority targets identified in the 2020 Induced Polarization ("IP") survey. In addition, an expanded IP geophysical survey, mapping and prospecting programs are planned as part of this season's program, with the aim of advancing earlier-stage targets to drill-ready status across Stillwater West's 32-kilometer strike length. Group Ten is rapidly advancing the Stillwater West PGE-Ni-Cu-Co + Au project towards becoming a world-class source of low-carbon, sulphide-hosted nickel, copper, and cobalt, critical to the electrification movement, as well as key catalytic metals including platinum, palladium and rhodium used in catalytic converters, fuel cells, and the production of green hydrogen. Stillwater West positions Group Ten as the second-largest landholder in the Stillwater Complex, with a 100%-owned position adjoining and adjacent to Sibanye-Stillwater PGE mines in south-central Montana, USA. The Stillwater Complex is recognized as one of the top regions in the world for PGE-Ni-Cu-Co mineralization, alongside the Bushveld Complex and Great Dyke in southern Africa, which are similar layered intrusions. The J-M Reef, and other PGE-enriched sulphide horizons in the Stillwater Complex, share many similarities with the highly prolific Merensky and UG2 Reefs in the Bushveld Complex. Group Ten's work in the lower Stillwater Complex has demonstrated the presence of large-scale disseminated and high-sulphide battery metals and PGE mineralization, similar to the Platreef in the Bushveld Complex2. Drill campaigns by the Company, complemented by a substantial historic drill database, are driving 3D models of Platreef-style mineralization in the five most advanced target areas, three of which are expected to become formal mineral resources by mid-2021. Multiple earlier-stage Platreef-style and reef-type targets are being advanced across the rest of the 32-kilometer length of the project based on strong correlations seen in soil and rock geochemistry, geophysical surveys, geologic mapping, and drilling.