Hoffmann Green Cement Technologies announced that it has launched the construction of its second production site, made entirely from Hoffmann Green cement, and confirms its industrial development. This exceptional structure located next to the first production site, “H1”, in Bournezeau (Vendée, western France) and built entirely from Hoffmann Green cement, will have a production capacity of 250,000 metric tons a year. The concept and design of “H2” were defined using feedback on “H1”. Thus, with its 70-meter-high mixing tower, “H2” is a vertical plant in which cement production will follow a gravity-driven process enabling the unit’s production to be optimized. This site’s verticality also enables it to occupy a land take of just 1.5 hectares: “H2”’s limited land take will thus be half that of “H1” but its production capacity will be 5 times greater. “H2” will be the model unit used for development, in France and abroad, in the shape of licensing agreements. This second site’s budget is an estimated 22 million euros, and it is scheduled to become operational during the second half of 2022, in line with the Company’s industrial roadmap.