Infinity Stone Ventures Corp. announced its winter drill program on the Buda Lithium Project, to test pegmatite layers perpendicular to outcrop zones. The Company anticipates having pre-drill surveying of roads, trails and pads completed by November 30, 2022, with mobilisation of drill equipment following thereafter and commencement by December 5th, 2022.

The Company was able to re-mobilise drilling equipment from the Rockstone Graphite Fall Drill Program to minimise costs and increase efficiencies. The Winter Drill Program follows the Company's initial exploration program that returned samples with elevated Rb, Be, Li, Cs and Ta values. As reported in the Company's news release dated November 16, 2022, out of the 32 grab samples, one sample returned a lithium value of 367 ppm Li.

7 samples returned rubidium values exceeding 1,000 ppm Rb, with a high of 2,090 ppm Rb in sample E6096115, and an average of 720 ppm Rb across all 32 grab samples. Sample E6096111 returned a highly anomalous beryllium value of 4,200 ppm Be along with 1,320 ppm Rb. The Buda Pegmatite is classified as a rare metal LCT pegmatite, which are characteristically enriched in lithium, cesium, tantalum, beryllium, rubidium, niobium, and tin.

At least six other pegmatite dikes are present on the property. Present sampling follows local strike orientation of the pegmatite dike swarm, as indicated by structural rock fabric measurements.