Wesley Whymark
November 5, 2021
Mini Bulk Sampling Phase 2 Update
Wesley Whymark
November 5, 2021
The 2nd phase of mini bulk sampling, consisting of 22 one cubic metre pits from Eastern Reef, Trench 1 and Trench 2 is well underway. The pits have been drilled, blasted and excavated into bulk bags. Assays from the mini bulk samples will be used for grade estimation of the larger scale 50,000 tonne bulk sampling program.
Excavator beside mini bulk sample pit at Eastern Reef " data-lightbox-theme="dark">View fullsize

Excavator beside mini bulk sample pit at Eastern Reef

Geologist Renan beside pit muck at Eastern Reef" data-lightbox-theme="dark">View fullsize

Geologist Renan beside pit muck at Eastern Reef

Mini bulk samples southeast of Trench 1" data-lightbox-theme="dark">View fullsize

Mini bulk samples southeast of Trench 1

Excavated 1 cubic metre mini bulk sample pit" data-lightbox-theme="dark">View fullsize

Excavated 1 cubic metre mini bulk sample pit

Geologist Renan and VP Exploration Wesley excavating a mini bulk sample pit " data-lightbox-theme="dark">View fullsize

Geologist Renan and VP Exploration Wesley excavating a mini bulk sample pit

Geologists, Renan and Nick with VP Exploration Wesley excavating a mini bulk sample pit" data-lightbox-theme="dark">View fullsize

Geologists, Renan and Nick with VP Exploration Wesley excavating a mini bulk sample pit

Older PostInventus Board of Directors Tour

Attachments

  • Original document
  • Permalink

Disclaimer

Inventus Mining Corp. published this content on 05 November 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 05 November 2021 14:27:10 UTC.