Invictus Energy Limited provided an update on the activities of its 80% owned and operated Cabora Bassa Project in Zimbabwe. Following the award of the seismic acquisition contract to Polaris Natural Resources Inc. ("Polaris") as announced on 21 April 2021 on the ASX platform, the Company is pleased to provide an update on the seismic program. Polaris has received work permits for their expatriate staff and have begun mobilising personnel to Zimbabwe to commence the 2D seismic campaign and are due to arrive in the next few days. The Company has commenced assisting Polaris with the recruitment of up to 100 local employees who will be involved in the seismic campaign, the vast majority of which are expected to come from within the local communities. The camp construction will commence prior to the end of June and is expected to be completed in early July. The seismic campaign is estimated to officially commence in July with line clearing operations and followed by seismic data acquisition. The vibroseis units and recording equipment is currently in transit to Zimbabwe. The Company intends to conduct, process, and interpret a minimum of 400 line kms of 2D seismic in order to refine the Muzarabani-1 drilling location and well path and identify additional prospectivity for the upcoming drilling campaign. The proposed seismic survey will be conducted with a minimal environmental footprint and utilise existing roads and tracks where possible. The Company is also pleased to announce that Aztech Well Construction ("Aztech") has been appointed as Drilling Project Manager for the upcoming basin opening drilling program. Aztech is a well project management company headquartered in Perth with an extensive track record in both onshore and offshore drilling projects. The plan for the drilling campaign is advancing well with the preliminary Basis of Well Design (BoWD) completed, which will enable the ordering of long lead drilling items (casing and wellheads) for fabrication. The BoWD will be further refined and finalised once the seismic processing and interpretation has been completed. The Company has received strong interest from multiple drilling rig contractors in the region and further afield to provide a rig for the campaign. Aztech are concluding the technical evaluation of the rig contractor options ahead of shortlisting to participate in a formal process to select a rig for the campaign.