Itronics reported that it has completed recovery tests on two samples taken from the iron mine tailings pile located on Auric Fulstone claims in Nevada adjacent to the formerly operating Minnesota Mine. Assay results show that these tailings have a metal and mineral content that has a significant gross value, perhaps $350 per ton. The Rock Kleen tests have shown that a significant portion of the metal content and industrial mineral content can be recovered, perhaps $100 per ton when all the material is sold. Additional recovery work needs to be completed on metals, clays, and other minerals. The Company believes that these components, when recovery is optimized, will provide significant additional value per ton. The indicated values are high enough to justify moving forward with the Rock Kleen pilot plant development using Fulstone tailings as the feed material. This pilot plant is being planned for installation at the Itronics Cleantech Materials Campus (ICMC), in Wabuska, Nevada.