CERTIFICATE of AUTHOR

This Certificate of Author has been prepared to meet the requirements of National Instrument 43-101 Standards of Disclosure for Mineral Projects, Part 8.1.

  1. Name, Address, Occupation: Jeremy Witley
    The MSA Group (Pty) Ltd, Henley House, Greenacres Office Park, Cnr Victory & Rustenburg Roads, Victory Park, 2195, Johannesburg, South Africa.
    Geologist, employed as Head of Department - Mineral Resources.
  2. Title and Date of Technical Report:
    "Kipushi 2022 Feasibility Study", with an effective date of 14 February 2022 (the "Technical Report")
  3. Qualifications:
    I graduated with a BSc Hons (Mining Geology) from the University of the Leicester in 1988 and I obtained an MSc (Eng.) from the University of the Witwatersrand in 2015. I am a Professional Natural Scientist (Pr.Sci.Nat. 400181/05) registered with the South African Council for Natural Scientific Professions and a Fellow of the Geological Society of South Africa (Membership Number 60286). I have practiced my profession continuously since 1988 and I have worked in a number of roles, including mine geology, exploration geology, mineral resource management and as a consultant. I have conducted mineral resource estimates, audits and reviews for a wide range of commodities and styles of mineralization. As a result of my qualifications and experience, I am a Qualified Person as defined in National Instrument 43-101.
  4. Site Inspection:
    I visited the property from 8 September 2014 to 11 September 2014, from11 May 2015 to 13 May 2015 and again from 13 to 15 November 2017.
  5. Responsibilities:
    I am responsible for Sections 1.10, 1.21 and 1.22, Section 2, Section 3, Section 14, Section 25.1, Section 26.1 and Section 27 of the Technical Report
  6. Independence: I am independent of Ivanhoe Mines Ltd. in accordance with the application of Section 1.5 of National Instrument 43-101
  7. Prior Involvement:
    I have been working on various aspects of the studies of the project since 2013.
  8. Compliance with NI 43-101:
    I have read National Instrument 43-101 and Form 43-101FI and the Technical Report has been prepared in compliance with same.
  9. Disclosure:
    As of 14 February 2022, to the best of my knowledge, information and belief, the sections of the Technical Report for which I am responsible contain all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

Dated: 04 March 2022.

/s/Jeremy WitleyJeremy C Witley

Head of Department - Mineral Resources

The MSA Group (Pty) Ltd

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Ivanhoe Mines Ltd. published this content on 04 March 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 04 March 2022 19:55:05 UTC.