Tokyo-
1. Routes/Number of Flights
After all three Airbus A321ceo P2F aircraft*are in operation from
(1)
(2)
(3)
(4)
*Note: Maximum Payload: 28t/aircraft (equivalent to 5-6 10-ton vehicles)
Loading Containers: AAY containers(Main Deck): 14 units AKH containers (
2. Aircraft Delivery, and refurbishment of aircraft, etc.
(1) Delivery
Two of the three aircraft have been delivered and the remaining one is scheduled to be received in
(2) Refurbishment of aircraft
Conversion of the aircraft from a passenger aircraft to a dedicated freighter aircraft will begin sequentially in
*EFW was jointly established by AIRBUS, an aircraft manufacturer, and ST Engineering of
(3)
The operating company will be changed to
In light of the external environment, the
(4) Others
a. Facilities and aircraft
At each of the airports where freighters are scheduled to operate, we are installing the necessary aircraft and improving the facilities required for the launch of freighters.
b. Recruitment
Both companies will hire new personnel, including those who will be involved in flight operations and freight handling, in preparation for the launch of the new aircraft in 2024.
Reference Images:
Airbus 321-200P2F: Image of the modified fuselage
(1) Main deck cargo door
(2) Main deck interior
(3) Storage view of the received aircraft, and image of the aircraft design
Press Contact:
Public Relations,
Corporate Communications,
Reference:
https://www.yamato-hd.co.jp/news/attachment/newsrelease20220124_en 02.pdf
(C) 2022 Electronic News Publishing, source