Jersey Oil and Gas Plc provided an operational update in respect of its Greater Buchan Area ("GBA") Development Project. Phase 1 will deliver a single integrated wellhead, production, utilities and quarters (WPUQ) Platform located at the Buchan field. Production from the reservoirs will be supported by injection of both produced water and seawater and down-hole electric pumps (ESPs). The facility will be normally manned. The Buchan wells will be drilled utilising a heavy-duty jack-up (HDJU) located over a 12 slot well bay. The Phase 1 facilities will be designed to accommodate Phase 2 and Phase 3 of the development. Phase 2 will develop the J2 West, J2 East and Verbier East discoveries via a subsea tie-back to the GBA platform. Phase 3 will develop the Verbier West discovery, via connection to the Phase 2 subsea infrastructure.