KKB Engineering Berhad has received a Letter of Award from Kuching Water Board (KWB) for Diversion Works of the Existing 1100mm N.D. MSCL Pumping Mains at Sg. Maong Paroh, Jalan Matang/Batu Kawa, Kuching Division (KWB Contract). For KWB Contract, the contract execution period is Twelve months.