KKB Engineering Berhad has received a Letter of Award from Kuching Water Board (KWB) for Diversion Works of the Existing 1100mm N.D. MSCL Pumping Mains at Sg. Maong Paroh, Jalan Matang/Batu Kawa, Kuching Division (KWB Contract). For KWB Contract, the contract execution period is Twelve months.
End-of-day quote
Other stock markets
|
5-day change | 1st Jan Change | ||
1.78 MYR | +1.71% | +0.56% | +21.09% |
EPS Revisions
Annual profits - Rate of surprise
1st Jan change | Capi. | |
---|---|---|
+21.09% | 108M | |
-2.51% | 68.95B | |
+1.99% | 59.56B | |
+13.79% | 35.95B | |
+11.43% | 30.8B | |
+2.06% | 26.2B | |
+25.00% | 22.33B | |
+13.33% | 19.12B | |
+18.39% | 17.42B | |
+54.38% | 15.65B |
- Stock Market
- Equities
- KKB Stock
- News KKB Engineering
- KKB Engineering Berhad receives Letter of Award from Kuching Water Board