Liberty Gold Corp. released results from five large diameter core holes drilled to support phase 3 metallurgical column testing from the D-1, D-2 and D-3 zones include3: 3.32 g/t Au over 47.4 m, including 12.5 g/t Au over 5.8 m in LBP214C. 3.62 g/t Au over 8.1 m and 1.27 g/t Au over 54.2 m, including 2.51 g/t Au over 17.0 m in LBP222C. 1.12 g/t Au over 13.4 m and 3.16 g/t Au over 32.0 m in LBP207C. 1.44 g/t Au over 16.5 m and 1.36 g/t Au over 15.2 m and 1.23 g/t Au over 7.6 m in LBP197C.