Linear Minerals Corp. announced results of Drill Holes LC24-95 and LC24-96 from 2024 exploratory drill program at its Augustus Lithium Property in Quebec, Canada. The drill hole LC24-95 intercepted 0.46% lithium oxide (Li2O) over 25.15 m at 88.45 m drilled depth.

The bottom lithium intercept is 5.55 m wide averaging 0.52% Li2O at 135.55 m drilled depth with anomalous values of 104 ppm Be, 285 ppm Cs, and 705 ppm Rb. Drill Program Details: Drill hole LC23-95 was drilled at location 5367862.387N, 287146.203E, UTM NAD 1983 Zone 18N, at azimuth 222.41 degrees (true north) and dip -52 with a drilled depth of 158 m. The drill hole was placed at the main Augustus zone. The drill program was designed based on historical and current exploration data.

Drilling was conducted by Forage Pelletier Drilling of Chapais, Quebec, and core logging and sampling took place at a core shack in St-Dominique du Rosaire, approximately 50 km from the property. The 2024 drill program included 11 drill holes, totaling 1,558 metres. To date, a total of 100 drill holes have been completed on the Property, with a cumulative diamond drilling of 18,165.64 metres.