Mawson Gold Limited announced drill results from 7 drill holes totaling 2,692 metres from the South Palokas prospect area as part of the Company’s 76 hole, 19,422 metre 2020/21 drill program at the Company’s 100%-owned Rajapalot gold-cobalt project in Finland. Gold and cobalt assay results are reported here from 7 holes for 2,692 metres from the 2020/21 drill program. In total, since drilling commenced in September 2020, Mawson has drilled 76 drillholes for 19,422 metres. The holes released here are all from the South Palokas prospect (PAL0286, PAL0296, PAL0299, PAL0303, PAL0305, PAL0307 and PAL0308). A full set of reported results is shown in Table 3. Intersections are reported with a lower cut of 0.3 g/t AuEq over a two metre lower cut. No upper cut-off was applied. Higher-grade intersections use a 1.1 g/t AuEq lower cut over two metres. A total of 36 drill holes for 8,438 metres from five individual prospect areas remain to be reported, with a resource upgrade at Rajapalot scheduled during August 2021.