Metal Hawk Limited provided a drilling update for the Berehaven Nickel Project, 20km south-east of Kalgoorlie in the West Australian goldfields. The first diamond drillhole at the Commodore Nickel Prospect was drilled 50m down-dip from the discovery RC hole BVNC002 which intersected 1m @ 5.89% Ni from 144m. BVD001 intersected a 3.4m thick zone of matrix and heavily disseminated nickel sulphide mineralisation near the basal contact of targeted ultramafic rocks. This zone of mineralisation is located 90 metres above the top of the downhole electromagnetic (DHEM)conductor plate CMA_01 which was identified from surveying of RC holes BVNC001 to BVNC003. Additionally, three RC holes have been completed along strike of the discovery hole BVNC002. All of these holes have intersected the target ultramafic stratigraphy which will be further tested at depth with diamond drilling and DHEM. BVNC004 intersected 13m of highly weathered and ferruginous ultramafic rocks from 132m to 144m with heavily disseminated sulphides intersected from 144 to 145mm. BVNC005 intersected a zone of ultramafic rocks from 138m to 157m with stringer and disseminated nickel sulphide mineralisation from 155m to 157m. BVNC006 intersected the target ultramafic unit from 151m to 164m with no visible sulphide mineralisation. Diamond drilling is continuing with BVD002 targeting the mineralised zone at depth and testing the DHEM conductor CMA_001. All diamond holes will be cased with 40mm PVC and will be surveyed with DHEM which will be used to define new drill targets. RC drilling will continue to explore the strike extent of ultramafic rocks and provide pre-collars to fast track diamond drilling.