Metallum Resources Inc. reported results from its Phase 1 drill program at the Superior high-grade zinc and copper polymetallic project, located 150 km East of Thunder Bay in the province of Ontario, Canada. The Phase 1 drilling comprised 2,100m in 6 drillholes. Results of Recent Drilling: The Phase 1 drillholes targeted the up-dip and down-dip extensions of the Lower Pick Zones outside of the current resource, as well as up dip extension of the Winston Horizon. Ongoing Work: Compilation and analysis of historical whole rock geochemistry by Metallum has outlined significant alteration zones along the Winston Lake Horizon that have seen little or no drilling to date. Whole rock data from the Phase 1 drilling has confirmed VMS-associated footwall alteration in the target areas of Holes PLV-003 and PLV-006. Holes PLV-001, 004, and 005, which tested the Pick Lake Horizon near surface, intersected significant disseminated to locally massive sulfide mineralization with highly anomalous Cu, Zn and Ag values. Re-interpretation of the historic VTEM and TDEM geophysical surveys resulted in the generation of new near-surface targets up dip of the Pick Lake Deposit. Phase 1 drilling tested these targets and had positive results, intersecting the mineralization and hydrothermal alteration. Based on these, Phase 2 drilling will continue to use this re-interpreted data to explore for thicker, higher-grade mineralization along the Pick Lake Horizon which is largely underexplored near surface. The mineralization of Lower Pick Zone is similar to that of Winston Mine, which produced 3.3 Mt at 14% Zn, 1% Cu, 1g/t Au and 30 g/t Ag.