Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement.
OVERSEAS REGULATORY ANNOUNCEMENT
This announcement is made pursuant to Rule 13.10B of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited.
The following is the full text of the information published by Metallurgical Corporation of China Ltd.* (the "Company") on the website of the Shanghai Stock Exchange on 14 September 2020 for information purpose only.
By order of the board of directors
Metallurgical Corporation of China Ltd.*
Zeng Gang
Joint Company Secretary
Beijing, the PRC
14 September 2020
As at the date of this announcement, the Board of the Company comprises one executive director: Mr. Guo Wenqing; four independent non-executive directors: Mr. Zhou Jichang, Mr. Yu Hailong, Mr. Ren Xudong and Mr. NG, Kar Ling Johnny; and one non-executive director: Mr. Yan Aizhong.
- For identification purposes only
- 1 -
A Share Abbreviation: MCC | Stock Code (A share): 601618 | Announcement No.: Lin 2020-072 |
METALLURGICAL CORPORATION OF CHINA LTD.* BRIEFING ON THE NEWLY SIGNED CONTRACTS FROM JANUARY TO AUGUST IN 2020
The board of directors and all directors of Metallurgical Corporation of China Ltd.* (the "Company") warrant that the contents of this announcement do not contain any misrepresentation, misleading statement or material omission, and accept several and joint responsibilities for the truthfulness, accuracy and completeness of the contents of this announcement.
The value of newly signed contracts of the Company from January to August in 2020 amounted to RMB600.34 billion, representing an increase of 27.0% from the same period of last year, among which, the value of overseas contracts amounted to RMB13.18 billion.
In August, newly signed individual material engineering and construction contracts of the Company with value of more than RMB1 billion are set out as follows:
Unit: RMB'00 million
Contractual | |||
No. | Party to the Contract | Name of Project (Contract) | Amount |
1 | MCC Capital | General Contract of Annual Production of 2.7 million | 96.5 |
Engineering | tons of Special Steel by Linyi Iron & Steel Investment | ||
& Research | Group Special Steel Co., Ltd. ( 臨沂鋼鐵投資集團 | ||
Incorporation | 特鋼有限公司年產270 萬噸優特鋼項目總承包 | ||
Limited | 合同) | ||
2 | WISDRI Engineering | General Contract of Engineering of H1-H4 Land Parcel | 29.7 |
& Research | for Project of Construction of Residential Buildings | ||
Incorporation | in Original Area and Ancillary Facilities in Shenjiaji, | ||
Limited | Jiang'an District, Wuhan City ( 武漢市江岸區諶家 | ||
磯還建住宅及配套設施項目H1-H4 地塊工程總 | |||
承包合同) | |||
3 | China MCC 5 Group | EPC General Contract for the Improvement Project of | 18.1 |
Co., Ltd. | Tourism Services Ancillary (Sun Hotel · Shuijingjing | ||
Plaza), Nanxun Ancient Town, Huzhou City, Zhejiang | |||
Province ( 浙江省湖州市南潯古鎮旅遊服務配 | |||
套提升項目(太陽酒店 • 水晶晶廣場)EPC 總承 | |||
包合同) |
- 2 -
Contractual | |||
No. | Party to the Contract | Name of Project (Contract) | Amount |
4 | China MCC 5 Group | Exploration - Design - Construction General Contract of | 15.7 |
Co., Ltd. | Construction Project of Tianfu Art Park • Wenbofang | ||
Area Site in Chengdu City ( 成都市天府藝術公園 • | |||
文博坊片區場館建設項目勘察- 設計- 施工總 | |||
承包合同) | |||
5 | Huatian Engineering | Steelmaking Engineering Relocation Project for the City | 14.9 |
& Technology | Steel Plant Relocation of Hebei Tianzhu Steel Group | ||
Corporation, MCC | Co., Ltd. ( 河北天柱鋼鐵集團有限公司城市鋼 | ||
廠搬遷煉鋼工程項目) | |||
6 | CISDI Group Co., Ltd. | Engineering and Contractor Construction Project of | 14.3 |
Central Hospital Extension (Phase II) in Guangming | |||
District, Shenzhen City ( 深圳市光明區中心醫院 | |||
續建(二期)工程代建項目) | |||
7 | China MCC 17 Group | Jingdezhen Vocational University of Art Project (Phase I) | 13.7 |
Co., Ltd | - General Contracting Project of Survey, Design and | ||
Construction in Area A ( 景德鎮藝術職業大學項 | |||
目(一期)-- A 區工程勘察設計採購施工總承 | |||
包項目) | |||
8 | China Second | General Contract of Promotion of Supply-side Structural | 11.1 |
Metallurgical Group | Reform and Implementation of Environmental | ||
Corporation Limited | Protection Transformation and Upgrading Project and | ||
Engineering of Comprehensive Raw Materials Factory | |||
of Kunming Iron & Steel Holdings Co. Ltd. of Wuhan | |||
Iron and Steel Group ( 武鋼集團昆明鋼鐵股份有 | |||
限公司推進供給側結構性改革實施環保搬遷 | |||
轉型升級項目綜合原料場工程總承包合同) | |||
9 | Shanghai Baoye Group | Supplementary Agreement (II) of Modern Urbanization | 11.0 |
Co., Ltd. | Construction Project (Phase I) Changchun Longxiang | ||
International Business Center Project (II) in Changchun | |||
New District (長春新區新型城鎮化建設項目(一期) | |||
長春龍翔國際商務中心項目補充協議(二)) | |||
10 | WISDRI Engineering | General Contract of the Steelmaking and Continuous | 10.8 |
& Research | Casting Project of Henan Angang Zhoukou Iron and | ||
Incorporation | Steel Co., Ltd. ( 河南安鋼周口鋼鐵有限責任公 | ||
Limited | 司煉鋼連鑄項目總承包合同) | ||
11 | China MCC 20 Group | EPC General Contract for Survey, Design, Construction | 10.5 |
Co., Ltd. | and Procurement of the 2017 Renovation Project of | ||
Cuijia Village area (Phase III) Urban Shanty-town in | |||
Yanhe County of Guizhou Province ( 貴州省沿河縣 | |||
2017 年崔家村片區(三期)城市棚戶區改造項目 | |||
勘察設計施工採購EPC 總承包合同) |
- 3 -
Contractual | |||
No. | Party to the Contract | Name of Project (Contract) | Amount |
12 | Shanghai Baoye Group | Renovation Project of Shanty Town of Shuxiang Beiyuan | 10.4 |
Co., Ltd. | (Inner-City Villages) in Nehe City, Heilongjiang | ||
Province ( 黑龍江省訥河市書香北苑(城中村)棚 | |||
戶區改造項目) | |||
13 | Shanghai Baoye Group | Engineering and Construction Project of Resettlement | 10.4 |
Co., Ltd. | Point of Qishanshuijun in Chaohu City, Anhui Province | ||
( 安徽省巢湖市旗山水郡安置點工程施工項目) | |||
14 | Shanghai Baoye Group | Renovation (Tienan Land) Project of Shanty Town in | 10.1 |
Co., Ltd. | Nehe City, Heilongjiang Province ( 黑龍江省訥河市 | ||
棚戶區改造(鐵南地塊)項目) | |||
Total amount of material contracts with value of more than RMB1 billion | 277.2 | ||
The information above is preliminary and for investors' reference only. For final information, please refer to the disclosure in the periodic report.
Notice is hereby given.
The board of directors of
Metallurgical Corporation of China Ltd.*
14 September 2020
- 4 -
This is an excerpt of the original content. To continue reading it, access the original document here.
Attachments
- Original document
- Permalink
Disclaimer
Metallurgical Corporation of China Ltd. published this content on 14 September 2020 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 14 September 2020 08:39:01 UTC