MetalsTech Limited announced an update on its diamond drilling program at the company’s completed six diamond drill holes as part of the company’s maiden underground drilling program from within the Andrej Adit. The current diamond drilling program has been designed to test for southern extensions to the high-grade plunging zone within the existing sturec Mineral resource. Drilling Assay Results from UGA-04: Drilling of UGA-04 was completed to a depth of 140.90m. Drilling hole UGA-04 was planned to extend the interpreted mineralized zone approximately 100m along strike from the southern extent of the Sturec JORC (2012) Mineral Resource; approximately 50m down dip from the where it has been historically mined within the Andrej Adit; and approximately 30m down dip from the current JORC (2012) Mineral Resource extents.