Minnova Corp. announced recent assay results and on-site activities. Following a detailed review and compilation of the Winter 2021 drill program the Company's technical team planned a 642 meter follow-up drill program consisting of 4 holes targeting: a) a south east trending mineralized vector on the main PL Deposit, b) shallow infill holes on the PL North Upper and Lower Zones to define mineralized structures in advance of planned open pit /bulk sample and c) a deeper, down dip hole to test the PL North mineralized trend at depth. The Company announced that Visible Gold had been intersected in DDH M-21-048x on April 20, 2021. Assay results confirmed a bonanza gold grade of 101.6 g/t over 0.50 meter interval with a weighted average grade of 51.95 g/t over the 1 meter mineralized structure. The significance of the intercept is twofold: It is the biggest step-out hole in the history of the project highlighting the down-dip and on-strike resource expansion and exploration potential of the PL property. This intercept is the 6th high grade assay in the history of the PL Deposit and highlights the potential for extremely high gold grades to occur in the mineralized structures that make up the PL Deposit and the evolving PL North target area. Other positive assay results were returned from shallow drilling on PL North Upper Zone. These include 2.95 g/t over 1.75 meters starting at a depth of 2.5 meters in DDH M-21-082 and 1.02 g/t over 3.5 meters starting at a depth of 17.0 meters in DDH M-21-083. Near surface gold mineralization on the PL North Upper Zone is being evaluated for future development, initially as an open pit /bulk sample that would ultimately be developed into a new northern portal. A second decline will provide more direct access to PL Deposit reserves targeted for initial development and optimize future underground mining operations. The benefits of a new northern decline were previously highlighted in the April 20, 2021. PL North Lower Zone continues to evolve as a mappable mineralized structure. The presence of high-grade assays between the PL North upper and lower zones are interpreted as higher order shear zones and possibly conjugate shear zones that link the two main mineralized structures at PL North. In addition to these subsidiary mineralized zones, gold-bearing quartz veins are consistently intersected at depth within the footwall tonalite, below the PL North Lower Zone link to press release where new Tonalite hosted mineralized structures were originally highlighted. These recently identified mineralized structures are interpreted to be the strike-extension of discontinuous, tonalite-hosted mineralized structures in the footwall of the PL Deposit, historically referred to as the Lower Lower Zone. The Location of DDH M-21-048x and other PL North Target drilling, relative to the PL Mill and main PL Deposit. The Company will provide further progress updates as internal studies and site work advances during the summer of 2021 and over the remainder of the year.