Navarre Minerals Limited ("Navarre"), via its 100% owned subsidiary Navarre Minerals Queensland Pty Ltd ("Navarre Minerals

Queensland"), has agreed to acquire the Mt Carlton Gold Mine ("Mt Carlton") and Crush Creek project ("Crush Creek"), located in

Queensland, Australia (collectively, the "Mt Carlton Operations") from Conquest Mining Pty Limited ("Conquest Mining"), a 100%

owned subsidiary of Evolution Mining Limited ("Evolution") (the "Transaction")

Acquisition consideration up to A$90 million ("Consideration"), comprised of:

A$40 million in upfront consideration paid at the time of Completion, of which payment of A$13.2 million will be satisfied by

Navarre issuing ordinary shares to Evolution, calculated by reference to the issue price per share under the Placement

Up to A$25 million in additional cash consideration payable upon the realisation of the following aggregate recoverable gold

Tra saction

production milestones from Crush Creek:

Overview

A$5 million at 50koz of gold production;

only

A$5 million at 100koz of gold production; and

A$15 million at 175koz of gold production

Up to A$25 million in additional cash consideration linked to the future gold price, with payments commencing 1 July 2023 and

running for a maximum of 15 years, calculated as follows:

If the average spot gold price in any quarter exceeds the equivalent of A$2,250/oz, 5% of the average spot gold price multiplied

by the aggregate ounces produced from the Mt Carlton Operations and sold in that quarter

Completion of the Transaction is expected to occur 5 business days after relevant customary closing conditions (including shareholder

approval) have been satisfied

Transaction

The Transaction and associated costs to be funded from the fully underwrittenconditional placement of A$36.8 million to new and

useF nding

existing institutional and sophisticated investors at an issue price of A$0.075 per fully paid ordinary new share

nal

2

ASSET OVERVIEW

U N E A R T H I N G P R O S P E R I T Y

ASX: NML

The Mt Carlton Operations comprises an open pit and underground mine, and a 950ktpa processing plant situated on a tenement package of ~815km2

Overview

Location

150km south of Townsville, Queensland

Tenement Package

~815km2 (3MLs, 1 MDL, 11 EPMs)

Mi

eralisation Type

High sulphidation epithermal deposit

Townsville

Mi

i g Method

Open pit and underground (open stoping)

Mt Carlton Operations

Pr

cess Method

Conventional crushing, grinding and flotation to produce a

Mackay

polymetallic concentrate

onlyPr cess Capacity

Queensland

950ktpa

Brisbane

Workforce

153 Full-time Employees / 120 Contractors (at 30 June 2021)

Acc ss

via ~40km gravel road (off Bruce Highway)

Pow r

Grid power supplied to site mine through 22kV lines with a

combined capacity of 6MW

Water

Burdekin river pipeline (225mm, 36km) 600ML agreement in

place

Safety

Total Reportable Injury Frequency: 7.4 (12mth moving avg. at

30 June 2021)

use

(1)

9.53Mt @ 1.26g/t for 387koz Gold

Mineral Resources

2.69Mt @ 0.49% for 13kt Copper

Ore Reserves(1)

6.43Mt @ 0.81g/t for 168koz Gold

0.62Mt @ 0.74% for 5kt Copper

3

(1) Extracted from Evolution's ASX Release dated 17 February 2021 entitled "Annual Mineral Resources and Ore Reserves Statement". See pages 35-37 for further details and also refer to Evolution's ASX Releases dated 12 February 2020 entitled

nal

"Annual Mineral Resources and Ore Reserves Statement" and dated 19 June 2020 entitled "Mt Carlton Update"

Telstra Hill open pit. Requires verification of prior drilling data but a likely supplemental ore source. Not currently included in MROR

POTENTIAL FOR MINE LIFE EXTENSION

AT MT CARLTON

U N E A R T H I N G P R O S P E R I T Y

ASX: NML

Residual resources at Mt Carlton economic under current prices, with underground extensions possible through investment in underground drilling. Permitting of satellite deposits advanced

Overview

Mt Carlton (V2 and A39) and Satellites

Economic extensions identified through technical due

diligence as a greater flexibility with price assumptions

and incremental drilling not captured in last MROR

(December 2020)

V2 pit: Link Zone/Western Feeder Zone.

only

Mineralisation continues to extend beyond existing

planned extraction

V2 Underground. Mining ongoing, extents remain

use

untested

A39 Underground

Mt Carlton United open pit. Ore body remains open at

depth and along strike

nal

4

CRUSH CREEK LOCATION AND

PROJECT AREA OVERVIEW

Crush Creek is located ~30km southeast of Mt Carlton in Queensland

U N E A R T H I N G P R O S P E R I T Y

ASX: NML

Location of Crush Creek in Relation to Mt Carlton

Crush Creek Project Area Showing Regional Targets

nal use only

5

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original document
  • Permalink

Disclaimer

Navarre Minerals Limited published this content on 15 November 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 15 November 2021 02:49:04 UTC.