New Age Exploration Limited announced that its technical team at Verum Group has commenced work on its New Zealand project for the 2021/2022 summer season. Over October a further eight (8) ridge and spur soil lines are planned to be completed along electromagnetic lineaments identified in April 2020 within the Lammerlaw Gold Project. NAE has also obtained an access arrangement within the Otago Pioneer Quartz (O.P.Q.) Project to complete trenching along the O.P.Q mineralised trend. NAE are continuing ridge and spur soil sampling along the northwest trending geophysical lineaments within prospecting permit 60544. These lineaments occur at boundaries between high and low response on airborne electromagnetic surveys that represent potential contact zones between pelitic (high response) and psammitic (low response) schist. These contact zones preferentially host mineralised shearing and veining in other deposits in the Otago Schist. Eight ridge and spur soil sample lines at 50m spacings are planned to be completed in October 2021. The remaining four ridge and soil lines are located on the southern EM lineaments yet to be tested by NAE. The southern EM lineaments show a similar geophysical response to the northern EM lineaments where NAE has identified anomalous gold-arsenic zones from previous soil sampling. Further in fill soil lines will target Arsenic, Gold or base metals anomalies which are associated with low angle shear-host orogenic gold mineralisation.