Log in
Log in
Or log in with
GoogleGoogle
Twitter Twitter
Facebook Facebook
Apple Apple     
Sign up
Or log in with
GoogleGoogle
Twitter Twitter
Facebook Facebook
Apple Apple     
  1. Homepage
  2. Equities
  3. Canada
  4. Toronto Stock Exchange
  5. New Pacific Metals Corp.
  6. News
  7. Summary
    NUAG   CA64782A1075

NEW PACIFIC METALS CORP.

(NUAG)
  Report
Delayed Toronto Stock Exchange  -  04:00 2022-12-02 pm EST
3.040 CAD   +3.05%
12/02New Pacific Metals : Name and Address of Reporting Issuer - Form 6-K
PU
11/29New Pacific Metals Reports an updated Mineral Resource Estimate for the Silver Sand Deposit, Bolivia, Increases Silver Ounces in Measured and Indicated Mineral Resources by 30%
AQ
11/28New Pacific Metals Reports 30% Increase In Resources At Silver Sand Deposit In Bolivia
MT
SummaryQuotesChartsNewsRatingsCalendarCompanyFinancialsConsensusRevisionsFunds 
SummaryMost relevantAll NewsOther languagesPress ReleasesOfficial PublicationsSector news

New Pacific Reports Drill Hole Assay Results and Remains on Schedule to Complete the Pea for the Silver Sand Project

09/19/2022 | 05:00am EST

New Pacific Metals Corp. announced the assay results of the final 53 drill holes from the 2022 resource infill and step-out drilling program completed at the Silver Sand Project. All assays from the 2022 drill program have now been received, and a mineral resource estimate update with all drill hole data is expected to be completed by October 2022.

In addition, Silver Sand's maiden Preliminary Economic Assessment ("PEA") report is on track for completion by the end of 2022 as planned (please refer to the Company's new release on February 8, 2022). The 2022 drill program of 19,323 metres in 86 drill holes, together with those holes drilled in 2021, intended to expand and improve the confidence in the geological model and Mineral Resource Estimate released in April 2020 and to be used for the PEA. Assay results for the first 33 holes were released on April 6, 2022, and May 31, 2002.

Step-out Drill hole DSS582501 intersected an interval of 44.77 m grading 214 grams per tonne ("g/t") silver ("Ag") from 30.57 m to 75.34 m, and an interval of 25.04 m grading 143 g/t Ag from 151.46 to 176.50 m. Step-out Drill hole DSS542505 intersected an interval of 34.25 m grading 121 g/t Ag from 33.90 m to 68.15 m, including 5.57 m grading 428 g/t Ag from 37.85 m to 43.42 m. Step-out Drill hole DSS325001 intersected an interval of 7.64 m grading 448 g/t Ag from 147.66 m to 155.30 m, and an interval of 19.76 m grading 150 g/t Ag from 163.00 m to 182.76 m. Step-out Drill hole DSS305002 intersected an interval of 16.00 m grading 315 g/t Ag from 7.83 m to 23.83 m. Step-out Drill hole DSS687502 intersected an interval of 16.66 m grading 147 g/t Ag from 26.87 m to 43.53 m, and multiple narrow mineralized intervals at depth. Step-out Drill hole DSS7002 intersected an interval of 15.26 m grading 285 g/t Ag from 25.28 m to 40.54 m, and multiple narrow mineralized intervals at depth. Infill Drill hole DSS542507 intersected an interval of 20.86 m grading 108 g/t Ag from 9.06 m to 29.92 m. Infill Drill hole DSS545015 intersected an interval of 30.60 m grading 119 g/t Ag from 94.82 m to 125.42 m. Infill Drill hole DSS5427 intersected an interval of 36.08 m grading 210 g/t Ag from 131.68 m to 167.76 m This infill hole was drilled in the core area of Silver Sand deposit and confirmed the continuity of high-grade mineralization.

Infill Drill hole DSS702501 tersected an interval of 54.19 m grading 132 g/t Ag from 84.90 m to 139.09 m.Infill Drill hole DSS547504 intersected an interval of 95.22 m grading 106 g/t Ag from 49.68 m to 144.90 m. Infill Drill hole DSS685002 intersected an interval of 31.30 m grading 171 g/t Ag from 11.66 m to 42.96 m, including 14.71 m grading 298 g/t Ag from 26.75 m to 41.46 m, and ultiple narrow mineralized intervals at depth. Infill Drill hole DSS487505 intersected an interval of 19.48 m grading 337 g/t Ag from 32.45 m to 51.93 m, including 8.63 m grading 715 g/t Ag from 38.53 m to 47.16 m, and multiple narrow mineralized intervals at depth.nfill Drill Hole DSS502506 intersected an interval of 17.11 m grading 144 g/t Ag from 22.5 m to 39.61 m, an interval of 19.2 m grading 409 g/t Ag from 60.3 m to 79.5 m, and an interval of 3.5 m grading 224 g/t Ag from 104.5m to 108.0 m. A geotechnical drill program commenced in August 2022 and is expected to be completed by the end of September. This 11-hole (2,460 m) program was designed and supervised by an independent specialist consulting firm for optimizing pit slope design in the PEA.

Geotechnical logging is carried out on oriented drill cores at drill sites.


ę S&P Capital IQ 2022
All news about NEW PACIFIC METALS CORP.
12/02New Pacific Metals : Name and Address of Reporting Issuer - Form 6-K
PU
11/29New Pacific Metals Reports an updated Mineral Resource Estimate for the Silver Sand Dep..
AQ
11/28New Pacific Metals Reports 30% Increase In Resources At Silver Sand Deposit In Bolivia
MT
11/28New Pacific Metals Reports an updated Mineral Resource Estimate for the Silver Sand Dep..
AQ
11/28New Pacific Metals Brief: Increased Silver Ounces in Measured a..
MT
11/28New Pacific Metals Brief: Reporting an updated Mineral Resource..
MT
11/28New Pacific Metals Corp. Reports an Updated Mineral Resource Estimate for the Silver Sa..
CI
11/22New Pacific Metals : Carangas Project Technical Report Department of Oruro, Bolivia - Form..
PU
11/22New pacific announces filing of the carangas project technical report
AQ
11/21New Pacific Metals Says Metallurgical Testing on Canangas Ores Show High-Grade Recoveri..
MT
More news
Financials
Sales 2023 - - -
Net income 2023 -7,55 M -5,61 M -5,61 M
Net Debt 2023 - - -
P/E ratio 2023 -76,0x
Yield 2023 -
Capitalization 476 M 354 M 354 M
Capi. / Sales 2023 -
Capi. / Sales 2024 -
Nbr of Employees 50
Free-Float 53,5%
Chart NEW PACIFIC METALS CORP.
Duration : Period :
New Pacific Metals Corp. Technical Analysis Chart | MarketScreener
Full-screen chart
Technical analysis trends NEW PACIFIC METALS CORP.
Short TermMid-TermLong Term
TrendsNeutralBearishBearish
Income Statement Evolution
Consensus
Sell
Buy
Mean consensus OUTPERFORM
Number of Analysts 3
Last Close Price 3,04 CAD
Average target price 4,50 CAD
Spread / Average Target 48,0%
EPS Revisions
Managers and Directors
Rui Feng Chief Executive Officer & Director
Jalen Yuan Chief Financial Officer
Terrance K. Salman Chairman
Jacob Austin Independent Director
Tok Pay Kong Independent Director
Sector and Competitors
1st jan.Capi. (M$)
NEW PACIFIC METALS CORP.-18.72%354
BHP GROUP LIMITED39.45%157 183
RIO TINTO PLC14.15%113 569
GLENCORE PLC48.90%87 011
ANGLO AMERICAN PLC9.28%49 019
SAUDI ARABIAN MINING COMPANY (MA'ADEN)77.83%45 702