In November 2019, NORBIT conducted a bathymetric and iLidar survey of four of the bridges in Budapest. The project was a callaboration with the Hungarian Water Management Center Duna Valley Directorate Surveyours.

See video from Case Study below

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Norbit ASA published this content on 27 June 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 27 June 2022 08:45:01 UTC.