Enefit Green signed a contract with the wind turbine manufacturer Nordex for the supply, erection and maintenance of wind turbines for the Sopi-Tootsi wind farm. Nordex supplies 38 wind turbines with a nominal capacity of 6.8MW each and will provide mainetenance during the following 30-year period. The estimated total cost of the supply and maintenance contract is EUR 346 million.

Nordex has supplied and installed wind turbines with a total capacity of 41 GW to more than 40 countries.