End of March, the German project developer Dirkshof ordered twenty N117/3600 turbines from the Nordex Group for the citizen wind farm Reussenkoege in Germany. The order also includes a Premium Service contract covering a period of five years with a three-time option to extend by a further five years. The citizen wind farm Reussenkoege is a repowering project in North Friesland near to the North Sea coast. The plan is to replace turbines of the 2MW class. The installation of the twenty N117/3600 turbines, each with a capacity of 3.6 MW and a hub height of 91 metres, will commence 2021. Commissioning of the last turbine is scheduled for 2022. In the German auction held for onshore wind turbines in December 2020 Dirkshof was awarded the contract for the 20-turbine Reussenkoege project. In 2020 onshore wind turbines with a total capacity of 1,431 MW were built in Germany. Compared to this record low of 2019, installations were up by approx. 46%. Last year, at 232 MW the Nordex Group recorded an increase in installations of 114% compared to 2019.