Nordex Group's new business with its latest turbine, the N149/4.0-4.5 for medium and light-wind sites, continues to boom. The manufacturer has been awarded a contract to supply and install 35 wind turbines for the Mortlake South Wind Farm project located in the state of Victoria in the south-east of Australia for its customer Acciona Energy Australia. The order was placed in the first quarter of 2019. The N149/4.0-4.5 is ideal for this site, which is located some 6 kilometres from the town of Mortlake and has average annual wind speeds of 7.7 metres a second. Thanks to its grid compatibility, it can be perfectly adapted to the individual grid connection requirements of the Australian market. The N149/4.0-4.5 has been designed to meet the grid requirements of the most demanding grid connection directives worldwide - a key criterion for choosing this turbine for Mortlake South.