The discussion and analysis below has been organized as follows:
•Executive summary, including introduction and overview, business strategy, and
changes to the business environment
during the period, including environmental and regulatory matters;
•Results of operations;
•Financial condition, addressing liquidity position, sources and uses of
liquidity, capital resources and requirements,
commitments, and off-balance sheet arrangements; and
•Known trends that may affect NRG's results of operations and financial
condition in the future.
As you read this discussion and analysis, refer to NRG's Condensed Consolidated
Statements of Operations to this Form 10-Q, which present the results of
operations for the three and six months ended June 30, 2022 and 2021. Also refer
to NRG's 2021 Form 10-K, which includes detailed discussions of various items
impacting the Company's business, results of operations and financial condition,
including: General section; Strategy section; Business Overview section,
including how regulation, weather, and other factors affect NRG's business; and
Critical Accounting Estimates section.
Executive Summary
Introduction and Overview
NRG is a consumer services company built on dynamic retail brands. NRG brings
the power of energy to customers by producing and selling energy and related
products and services, nation-wide in the U.S. and Canada in a manner that
delivers value to all of NRG's stakeholders. The Company sells power, natural
gas, home and power services, and develops innovative, sustainable solutions,
predominately under the brand names NRG, Reliant, Direct Energy, Green Mountain
Energy, Stream, and XOOM Energy. The Company has a customer base that includes
approximately 6 million Home customers as well as commercial, industrial, and
wholesale customers, supported by approximately 17,000 MW of generation as of
June 30, 2022.
Strategy
NRG's strategy is to maximize stockholder value through the safe production and
sale of reliable electricity and natural gas to its customers in the markets it
serves, while positioning the Company to provide innovative solutions to the
end-use energy or service consumer. This strategy is intended to enable the
Company to optimize the integrated model to generate stable and predictable cash
flow, significantly strengthen earnings and cost competitiveness, and lower risk
and volatility. Sustainability is a philosophy that underpins and facilitates
value creation across our business for our stakeholders. It is an integral piece
of NRG's strategy and ties directly to business success, reduced risks and
enhanced reputation.
To effectuate the Company's strategy, NRG is focused on: (i) serving the energy
needs of end-use residential, commercial and industrial, and wholesale customers
in competitive markets through multiple brands and channels; (ii) offering a
variety of energy products and services, including renewable energy solutions,
that are differentiated by innovative features, premium service, sustainability,
and loyalty/affinity programs; (iii) excellence in operating performance of its
assets; (iv) optimal hedging of its portfolio; and (v) engaging in disciplined
and transparent capital allocation.
The Company implemented a four-year plan that began in 2022 to spend $2 billion
in order to achieve growth through optimization of the Company's core power and
natural gas sales, as well as integrated solution sales within our core network
in both power and home services.
Energy Regulatory Matters
The Company's regulatory matters are described in the Company's 2021 Form 10-K
in Item 1, Business - Regulatory Matters. These matters have been updated below
and in Note 17, Regulatory Matters.
As participants in wholesale and retail energy markets and owners and operators
of power plants, certain NRG entities are subject to regulation by various
federal and state government agencies. These include the CFTC, FERC, NRC and the
PUCT, as well as other public utility commissions in certain states where NRG's
generation or distributed generation assets are located. In addition, NRG is
subject to the market rules, procedures and protocols of the various ISO and RTO
markets in which it participates. Likewise, certain NRG entities participating
in the retail markets are subject to rules and regulations established by the
states and provinces in which NRG entities are licensed to sell at retail. NRG
must also comply with the mandatory reliability requirements imposed by NERC and
the regional reliability entities in the regions where NRG operates.
37
--------------------------------------------------------------------------------
NRG's operations within the ERCOT footprint are not subject to rate regulation
by FERC, as they are deemed to operate solely within the ERCOT market and not in
interstate commerce. These operations are subject to regulation by the PUCT, as
well as to regulation by the NRC with respect to NRG's ownership interest in
STP.
Federal Energy Regulation
Congress continues to consider using the budget reconciliation process to pass
energy efficiency and clean energy tax incentives included in President Biden's
original Build Back Better initiative. NRG continues to closely monitor the
budget reconciliation process.
State and Provincial Energy Regulation
Illinois Legislation - Illinois enacted the Climate and Equitable Jobs Act
("CEJA") on September 15, 2021, which targets 100% clean energy by 2050. CEJA
focuses on (i) decarbonization, (ii) incentives to transition coal plants into
clean energy facilities and (iii) nuclear subsidies. A component of CEJA is the
Coal-to-Solar Energy Storage Grant Program. On June 1, 2022, the Illinois
Department of Commerce and Economic Opportunity announced that NRG is eligible
to receive almost $160 million over 10 years to develop battery storage at both
the Waukegan and Will County power plant sites.
Regional Regulatory Developments
NRG is affected by rule/tariff changes that occur in the ISO regions. For
further discussion on regulatory developments see Note 17, Regulatory Matters.
Texas
Public Utility Commission of Texas' Actions with Respect to Wholesale Pricing
and Market Design - In September 2021, the PUCT opened a rulemaking project to
evaluate whether it should amend its rules to modify the High System Wide Offer
cap ("HCAP") and the ORDC, which is intended to ensure prices in the competitive
market appropriately reflect the value of operating reserves as the system
approaches scarcity conditions. This rulemaking project concluded in December
2021, resulting in a rule amendment that lowered the HCAP to $5,000 per MWh and
which expanded the minimum contingency level to 3,000 MW in Phase I. These two
changes are broadly offsetting in their effect on overall average energy prices.
In 2022, the PUCT has focused on the development of a winter firm fuel product.
The PUCT directed ERCOT to issue a Request for Proposal to procure dual fuel
capability with on-site fuel storage as part of the initial firm fuel
procurement for the winter of 2022 and 2023. The procurement amount will be
3,000MW to 4,000MW and capped at a cost of $54 million. For Phase II, the PUCT
Chair endorsed a version of NRG's Load-Serving Entity Reliability Obligation
("LSERO") idea; that retailers and other LSEs should be obliged to purchase an
amount of physical reliability resources at critical hours commensurate with the
state's newly cautious view of planning for tail events. The PUCT has
prioritized the development of a Backstop Reserve Service prior to consideration
of an LSERO. ERCOT resource constraints will delay implementation, including
Phase II items, by 12 to 24 months. Recently, the South Texas Electric
Cooperative ("STEC") has filed a proposal to create a net-load based capacity
market that allocates costs to loads, renewables and thermal resources with
forced outages. A broad group of stakeholders, including NRG, have expressed
support for the PUCT to include the STEC proposal in the blueprint for further
review alongside the LSERO even though there is opposition for the specific cost
allocation mechanism. The PUCT contracted with consulting firm E3 to develop
design details and implementation specifics for the Phase II proposals due in
later summer or early fall 2022.
Activity on Securitization and ERCOT Pricing during Winter Storm Uri - The Texas
Legislature acted to pass a variety of securitization vehicles to finance
exceptionally high power and gas costs from Winter Storm Uri, including HB 4492.
ERCOT subsequently filed two applications requesting the PUCT to issue Debt
Obligation Orders ("DOOs") based on the legislation. On October 13, 2021, the
PUCT issued DOOs authorizing ERCOT's securitization of $800 million to cover
short payments and reimburse congestion revenue right account holders for amount
related to the default of market participants other than electric cooperatives
Brazos Electric Cooperative Inc. ("Brazos") and Rayburn Country Electric
Cooperative, Inc. ("Rayburn"), which are discussed below (the "Default
Securitization") and $2.1 billion related to highly priced ancillary service and
ORPDA during Winter Storm Uri (the "Uplift Securitization").
The DOOs require ERCOT to issue loans or securitized bonds through a bankruptcy
remote special purpose entity as the borrower and distribute the proceeds to
affected market participants for default-related short payments and to LSEs for
certain ancillary-service and ORDPA costs using an allocation of proceeds based
on an LSE's exposure to relevant costs as calculated by the LSE's prevailing
load-ratio share during the period of Winter Storm Uri, and a further
redistribution of proceeds initially allocated to other LSEs and customers who
opt-out of securitization. In turn, ERCOT will charge non-bypassable fees
related to the Default Securitization and Uplift Securitization to all qualified
scheduling entities and to all LSEs (other than those that have opted-out),
respectively. The Uplift Securitization provided for a one-time opt-out for
certain LSEs or individual transmission-level customers who in exchange for
foregoing any securitization-related proceeds likewise avoid future fees
assessed by ERCOT for the use of repaying ERCOT's debt obligations. However,
nearly all competitive REPs were required by the law to participate, ensuring
the charge established by the law is competitively neutral. These opt-outs and
calculations of the
38
--------------------------------------------------------------------------------
allocation of proceeds have been finalized. The $2.1 billion Uplift
Securitization was disbursed by ERCOT in June 2022, with NRG's LSEs collectively
receiving $689 million. NRG LSEs that assessed customers certain
ancillary-service and ORDPA costs during the period of Winter Storm Uri will be
obligated to provide a refund or credit to those customers proportionate to the
LSE's total recovery. The $800 million Default Securitization was disbursed by
ERCOT in November 2021, with NRG receiving $12 million.
Electric Cooperative Bankruptcy and Securitization - Of the defaults in the
ERCOT market, the majority is attributable to Brazos. Brazos currently is in
bankruptcy. NRG and ERCOT have both filed a proof of claim in the bankruptcy
proceeding of Brazos, and Brazos has challenged ERCOT's claim in a manner that
may prejudice NRG's claims against Brazos. During the fourth quarter of 2021,
ERCOT filed a motion to dismiss Brazos' complaint relating to ERCOT's proof of
claim, which NRG joined in support, but this motion was denied by the Bankruptcy
Court, and ERCOT, NRG and certain other parties appealed. On January 11, 2022,
the United States District Court for the Southern District of Texas entered an
order allowing the appellants to seek direct review from the Fifth Circuit Court
of Appeals of the Bankruptcy Court's decision on the motion to dismiss. On
January 18, 2022, ERCOT, NRG and certain other parties filed a petition for
direct review by the United States Court of Appeals for the Fifth Circuit. The
Court of Appeals granted the petition on February 4, 2022. On February 7, 2022,
the Bankruptcy Court entered an order granting summary judgment in favor of
Brazos on whether ERCOT's sales to Brazos were in the ordinary course of Brazos'
business. The Bankruptcy Court ruled that the portion of ERCOT's claims for
charges incurred by Brazos after the intervention of the PUCT and ERCOT were not
in the ordinary course and thus are not entitled to administrative expense
status under the Bankruptcy Code. The amount and priority of ERCOT's claim for
amounts incurred prior to such intervention or after such intervention ceased
are issues to be determined at trial. The Bankruptcy Court's summary judgment
ruling may also apply to NRG's claims again Brazos. To the extent the Bankruptcy
Court reduces or disallows claims against Brazos, this presents risk for NRG.
Trial on the merits of the ERCOT proof of claim and Brazos' complaint commenced
before the Bankruptcy Court on February 22, 2022. On the eighth day of trial,
the parties agreed to suspend the trial and pursue mediation. On March 25, 2022,
the Bankruptcy Court entered an order that appointed a mediator and abated the
trial for the duration of the mediation. NRG is participating in the mediation
with ERCOT, Brazos and various other parties in interest. On April 7, 2022, the
Fifth Circuit Court of Appeals entered an order extending briefing deadlines
applicable to the pending appeal of the Bankruptcy Court's ruling on the motion
to dismiss. Both the mediation schedule and briefing schedule before the Fifth
Circuit Court of Appeals have been repeatedly extended. At this time there is no
deadline for mediation to conclude, but a party may request that the Bankruptcy
Court terminate its participation in the mediation at any point. The current
deadline for opening appellate briefs has been extended to August 14, 2022, but
the parties have agreed to request a further extension to September 14, 2022,
and the deadline may be extended again by further order of the Fifth Circuit
Court of Appeals.
ERCOT's current market protocols provide for short payments to be extinguished
through a process of uplift, whereby the cost of defaults is allocated to all
market participants, including retailers, generators, municipal and cooperative
utilities, and financial traders. However, the total amount of this uplift is
limited by ERCOT's current protocols of $2.5 million per month. Consequently, it
would take approximately 63 years for the net short-pay balance of $1.887
billion related to Brazos to be uplifted to the market under the current market
rules. NRG's undiscounted share of the uplift based on its current market share
is estimated to be approximately $121 million and has been short-paid $68
million. The remaining $53 million has been discounted based on the 63-year
repayment term and present value of $9 million was recorded as an additional
liability.
In February 2022, Rayburn successfully completed a securitization transaction
and fully paid its outstanding obligations to ERCOT.
Reliability and Plant Operations Standards - The PUCT created a rulemaking to
establish weatherization standards and issued a notice for comments in response
to provisions of Texas Senate Bill 3 ("SB3") that require mandatory standards
for power generators and others within the electric-power sector. On October 21,
2021, Commissioners of the PUCT voted to adopt Phase 1 of the rule without
substantial modifications from the proposal, and those rules are now in effect.
On May 26, 2022, the PUCT issued a proposal for publication to repeal Phase I
rules and implement Phase 2 rules. The new rules entail conducting a weather
study by ERCOT and the State Climatologist to create a percentile-based standard
of weatherization and implementing weatherization plan audits based on weather
related outages that occur during weather emergencies. NRG filed comments to the
rulemaking on June 23, 2022. The matter is pending at the PUCT.
PJM
Indian River RMR Proceeding - On June 29, 2021, Indian River notified PJM that
it intended to retire Unit 4, effective May 31, 2022, due to expected uneconomic
operations. On July 30, 2021, PJM responded to the deactivation notice and
stated that PJM had identified reliability violations resulting from the
proposed deactivation of Unit 4. NRG filed a cost based RMR rate schedule at
FERC on April 1, 2022. FERC accepted the rate schedule with a June 1, 2022
effective date, subject to refund and established hearing and settlement
procedures. Multiple parties protested. Parties are currently in settlement
negotiations.
39
--------------------------------------------------------------------------------
PJM Revisions to Minimum Offer Price Rule - On July 30, 2021, PJM filed a
proposed tariff change at FERC to largely eliminate the current minimum offer
price rules ("MOPR") except in very narrow cases. The proposal would eliminate:
(i) the current MOPR for new entrant natural gas resources effective with the
2023/2024 delivery year and (ii) the expanded MOPR established in FERC's
December 2019 Order to address out-of-market subsidies. On September 30, 2021,
PJM's proposal went into effect by operation of law because the FERC
Commissioners were split 2-2 as to the lawfulness of the change. Multiple
parties filed motions for rehearing and ultimately appealed to the federal court
of appeals. On December 21, 2021 and December 30, 2021, respectively, the Third
Circuit Court of Appeals and the Seventh Circuit Court of Appeals issued an
order holding the appeals in abeyance. The Seventh Court appeal is being held in
abeyance while the appeal in the Third Court is moving forward with briefing.
The proposed revisions would allow PJM to address specific and narrow instances
of buyer-side market power through subsequent filings at FERC. Any changes to
the PJM capacity market construct may impact the outcome of future Base Residual
Auctions.
PJM's ORDC Filing and Compliance Directives - On May 21, 2020, PJM proposed
energy and reserve market reforms to enhance price formation in reserve markets,
which includes modifying its ORDC and aligning market-based reserve products in
Day-Ahead and Real-Time markets. In addition to approving PJM's proposal, FERC
also directed PJM to implement a forward-looking Energy and Ancillary Services
Offset to be used in PJM's capacity markets. After multiple compliance filings,
parties filed appeals at the Court of Appeals for the D.C. Circuit of FERC's
orders, and on August 13, 2021, FERC filed a motion and was granted a voluntary
remand the case back to the agency. On December 22, 2021, FERC issued its order
on voluntary remand affirming in part and reversing in part FERC's
determination. Specifically, FERC reversed itself and ordered PJM to: (i)
eliminate the more robust ORDC curves and reserve penalty adders and maintain
the existing (lower) curves and (lower) penalty adders and (ii) restore its
tariff provisions related to its prior backward-looking Energy and Ancillary
Services Offset. In response to requests for rehearing of the December 2021
order, FERC issued a notice denying the rehearings by operation of law and
providing for further consideration on February 22, 2022. Multiple parties filed
appeals in various appellate courts and all appeals are being held in abeyance.
Independent Market Monitor Market Seller Offer Cap Complaint - On March 18,
2021, finding that the calculation of the default Market Seller Offer Cap was
unjust and unreasonable, the Order permitted the current PJM May 2021 capacity
auction for the 2022/2023 delivery rule to continue under the existing rules and
set a procedural schedule for parties to file briefs with possible solutions. On
September 2, 2021, FERC issued an order in response to a complaint filed by the
PJM Independent Market Monitor's proposal, which eliminates the Cost of New
Entry-based Market Seller Offer Cap and implements a limited default cap for
certain asset classes based on going-forward costs and provides for unit
specific cost review by the Independent Market Monitor for all other non-zero
offers into the auctions. As required by the Order, PJM submitted its compliance
tariff on October 4, 2021. On October 4, 2021, certain parties filed a motion
for rehearing, which was denied by operation of law. On February 18, 2022, FERC
addressed the arguments raised on rehearing and rejected the rehearing requests.
Multiple parties filed appeals at the Court of Appeals for the D.C. Circuit. The
appeals were held in abeyance, but on April 13, 2022, the Court of Appeals
removed the appeals from abeyance. Briefing is underway.
Generator Interconnection Process Reform - On June 14, 2022, PJM filed proposed
tariff revisions at FERC regarding its interconnection process to provide for a
more efficient process and address the backlog in interconnection service
requests. The filing would transition the interconnect process from a
"first-come, first-served" queue approach to a "first-ready, first-served"
cluster/cycle approach. Additionally, project developers would be required to
provide more significant financial deposits and meet other thresholds in order
to move forward in the process. The filing is pending at FERC.
On June 16, 2022, FERC issued a Notice of Proposed Rulemaking to reform the
generator interconnection procedures across the ISOs/RTOs. Comments in response
to the Notice are due October 13, 2022.
New York
NYISO's Revisions to the Buyer-Side Mitigation Rules - On January 5, 2022, the
NYISO filed its Comprehensive Mitigation Review proposing changes to the
buyer-side mitigation rules. The proposal would remove certain facilities to be
reviewed under the buyer-side mitigation rules to serve the goals of New York's
Climate Leadership and Community Protection Act, adopt a marginal capacity
accreditation market design and adjust the rules surrounding installed and
unforced capacity. On February 9, 2022, FERC issued a deficiency notice,
focusing on capacity accreditation issues, which NYISO responded. On May 10,
2022, FERC issued an order accepting the NYISO's Comprehensive Mitigation
Review. Changes to NYISO's Buyer Side Mitigation rules may impact the outcome of
future capacity auctions.
California
California Resource Adequacy Proceedings - As part of the Integrated Resource
Procurement docket, the CPUC approved a decision on June 24, 2021 that will
require all LSEs to procure a pro rata share of 11.5 GW of new non-fossil
resource adequacy from 2023 to 2026. The state has also taken action to procure
additional resources beyond those required by all LSEs. First, the CPUC directed
the state's major investor-owned utilities to procure additional summer
reliability resources, up to 3 GW in total for the summers of 2021 through 2023.
In the same docket, the CPUC expanded demand response programs
40
--------------------------------------------------------------------------------
for use during emergency conditions. Second, the 2022 state budget included $2.2
billion for a Strategic Reliability Reserve Fund, which will compensate
utilities for above market import resource adequacy ("RA") costs for the summer
of 2022 and allow the Department of Water Resources to enter into contracts for
new capacity and capacity at risk of retirement. On June 23, 2022, the CPUC
approved a decision that has impacts to short-term RA procurement requirements
and the long-term RA structure. The decision raises the reserve margin from 15
percent to 16 percent in 2023 and at least 17 percent in 2024. In addition, the
value of solar for RA requirements was reduced for the months of March through
August. Starting in 2025, LSEs must demonstrate sufficient RA resources to meet
their load for all hours of the day, not just the gross peak. The change to RA
showings will also require changes to resource counting methodologies. The
result of these changes will likely keep RA prices elevated and increase the
cost to serve retail load in California.
Midway-Sunset Reliability Must Run Proceeding - San Joaquin Energy, LLC, a
subsidiary of NRG, owns a 50%, non-controlling interest in the Midway-Sunset
Cogeneration Company ("MSCC"). MSCC owns a cogeneration facility near Fellows,
California and submitted mothball notices for the cogeneration facility to the
CAISO in the latter half of 2020. On December 17, 2020, the CAISO Board
effectively rejected the mothball notices by authorizing its staff to designate
the MSCC facility as a RMR resource conditioned on execution of a RMR contract.
On January 29, 2021, MSCC made its RMR filing at FERC. Multiple parties filed
protests and on March 16, 2021, MSCC filed a response to those protests. On
April 2, 2021, FERC accepted the RMR filing, suspended it to become effective
February 1, 2021 subject to refund and established hearing and settlement judge
proceedings. On September 27, 2021, the CAISO gave notice to MSCC extending the
term of the reliability designation through December 31, 2022. On April 29,
2022, the participants in the settlement proceeding filed a Joint Offer of
Settlement with the FERC, which was approved by FERC on July 28, 2022.
Environmental Regulatory Matters
NRG is subject to numerous environmental laws in the development, construction,
ownership and operation of power plants. These laws generally require that
governmental permits and approvals be obtained before construction and
maintained during operation of power plants. Federal and state environmental
laws historically have become more stringent over time. Future laws may require
the addition of emissions controls or other environmental controls or impose
restrictions on the Company's operations. Complying with environmental laws
often involves specialized human resources and significant capital and operating
expenses, as well as occasionally curtailing operations. NRG decides to invest
capital for environmental controls based on the relative certainty of the
requirements, an evaluation of compliance options, and the expected economic
returns on capital.
A number of regulations that affect the Company have been revised recently by
the EPA, including ash storage and disposal requirements, NAAQS revisions and
implementation and effluent limitation guidelines. Some of these recent
revisions may, in turn, be revised by the current U.S. presidential
administration. NRG will evaluate the impact of these regulations as they are
revised but cannot fully predict the impact of each until anticipated revisions
and legal challenges are resolved. The Company's environmental matters are
described in the Company's 2021 Form 10-K in Item 1, Business - Environmental
Matters and Item 1A, Risk Factors. These matters have been updated in Note 18,
Environmental Matters, to the condensed consolidated financial statements of
this Form 10-Q and as follows.
Air
The CAA and the resulting regulations (as well as similar state and local
requirements) have the potential to affect air emissions, operating practices
and pollution control equipment required at power plants. Under the CAA, the EPA
sets NAAQS for certain pollutants including SO2, ozone, and PM2.5. Many of the
Company's facilities are located in or near areas that are classified by the EPA
as not achieving certain NAAQS (non-attainment areas). The relevant NAAQS may
become more stringent. The Company maintains a comprehensive compliance strategy
to address continuing and new requirements. Complying with increasingly
stringent air regulations could require the installation of additional emissions
control equipment at some NRG facilities or retiring of units if installing such
controls is not economic. Significant changes to air regulatory programs
affecting the Company are described below.
CPP/ACE Rules - The attention in recent years on GHG emissions has resulted in
federal and state regulations. In October 2015, the EPA promulgated the CPP,
addressing GHG emissions from existing EGUs. On February 9, 2016, the U.S.
Supreme Court stayed the CPP. In July 2019, EPA promulgated the ACE rule, which
rescinded the CPP, which had sought to broadly regulate CO2 emissions from the
power sector. On January 19, 2021, the D.C. Circuit vacated the ACE rule (but on
February 22, 2021, at the EPA's request, stayed the issuance of the portion of
the mandate that would have vacated the repeal of the CPP). On June 30, 2022,
the U.S. Supreme Court held that the "generation shifting" approach in the CPP
exceeded the powers granted to the EPA by Congress. The Court did not address
the related issues of whether the EPA may adopt only measures applied at each
source. The Company anticipates that there will be additional proceedings at the
D.C. Circuit and additional rulemaking by the EPA over the next several years.
41
--------------------------------------------------------------------------------
Cross-State Air Pollution Rule ("CSAPR") - In April 2022, the EPA proposed
revising the CSAPR to address the good-neighbor provisions of the 2015 ozone
NAAQS. If the rule were finalized as proposed, it would apply to 25 states
(including Texas) beginning in 2023. In 2023, the revised Group 3 trading
program (previously established in the Revised CSAPR Update Rule) would have
emission budgets based on NOx emission rates that the EPA says are achievable by
existing controls at power plants. Starting in 2026, the NOx budgets would be
reduced significantly based on levels achievable if SCR controls were installed
at coal-fueled power plants that do not currently have such controls. Starting
in 2025, the budgets would be updated annually to account for retirements,
changes to operations, and new units. The proposal also contemplates heightened
surrender requirements for units that exceed certain NOx emission rate
thresholds. Comments on the proposed rule were due in June 2022 and numerous
detailed comments were submitted. The Company cannot predict the outcome of this
proposed revision and anticipates that this rulemaking will be subject to legal
challenges after it is finalized.
Byproducts, Wastes, Hazardous Materials and Contamination
In April 2015, the EPA finalized the rule regulating byproducts of coal
combustion (e.g., ash and gypsum) as solid wastes under the RCRA. In September
2017, the EPA agreed to reconsider the rule. On July 30, 2018, the EPA
promulgated a rule that amended the 2015 ash rule by extending some of the
deadlines and providing more flexibility for compliance. On August 21, 2018, the
D.C. Circuit found, among other things, that the EPA had not adequately
regulated unlined ponds and legacy ponds. In 2019 and 2020, the EPA proposed
several changes to this rule. On August 28, 2020, the EPA finalized "A Holistic
Approach to Closure Part A: Deadline to Initiate Closure," which amended the
April 2015 Rule to address the August 2018 D.C. Circuit decision and extend some
of the deadlines. On November 12, 2020, the EPA finalized "A Holistic Approach
to Closure Part B: Alternative Demonstration for Unlined Surface Impoundments,"
which further amended the April 2015 Rule to, among other things, provide
procedures for requesting approval to operate existing ash impoundments with an
alternate liner.
Domestic Site Remediation Matters
Under certain federal, state and local environmental laws, a current or previous
owner or operator of a facility, including an electric generating facility, may
be required to investigate and remediate releases or threatened releases of
hazardous or toxic substances or petroleum products. NRG may be responsible for
property damage, personal injury and investigation and remediation costs
incurred by a party in connection with hazardous material releases or threatened
releases. These laws impose liability without regard to whether the owner knew
of or caused the presence of the hazardous substances, and the courts have
interpreted liability under such laws to be strict (without fault) and joint and
several. Cleanup obligations can often be triggered during the closure or
decommissioning of a facility, in addition to spills during its operations.
Further discussions of affected NRG sites can be found in Note 16, Commitments
and Contingencies, to the condensed consolidated financial statements.
Nuclear Waste - The federal government's program to construct a nuclear waste
repository at Yucca Mountain, Nevada was discontinued in 2010. Since 1998, the
U.S. DOE has been in default of the federal government's obligations to begin
accepting spent nuclear fuel, or SNF, and high-level radioactive waste, or HLW,
under the Nuclear Waste Policy Act. Owners of nuclear plants, including the
owners of STP, had been required to enter into contracts setting out the
obligations of the owners and the U.S. DOE, including the fees to be paid by the
owners for the U.S. DOE's services to license a spent fuel repository. Effective
May 16, 2014, the U.S. DOE stopped collecting the fees.
On February 5, 2013, STPNOC entered into a settlement agreement with the U.S.
DOE for payment of damages relating to the U.S. DOE's failure to accept SNF and
HLW under the Nuclear Waste Policy Act through December 31, 2013, which has been
extended three times through addendums to cover payments through December 31,
2022. There are no facilities for the reprocessing or permanent disposal of SNF
currently in operation in the U.S., nor has the NRC licensed any such
facilities. STPNOC currently stores all SNF generated by its nuclear generating
facilities on-site. STPNOC plans to continue to assert claims against the U.S.
DOE for damages relating to the U.S. DOE's failure to accept SNF and HLW.
Under the federal Low-Level Radioactive Waste Policy Act of 1980, as amended in
1985, the state of Texas is required to provide, either on its own or jointly
with other states in a compact, for the disposal of all low-level radioactive
waste generated within the state. Texas is currently in a compact with the state
of Vermont, and the compact low-level waste facility located in Andrews County
in Texas has been operational since 2012.
Water
The Company is required under the CWA to comply with intake and discharge
requirements, requirements for technological controls and operating practices.
As with air quality regulations, federal and state water regulations have become
more stringent and imposed new requirements.
Effluent Limitations Guidelines - In November 2015, the EPA revised the ELG for
Steam Electric Generating Facilities, which imposed more stringent requirements
(as individual permits were renewed) for wastewater streams from FGD, fly ash,
bottom ash and flue gas mercury control. On September 18, 2017, the EPA
promulgated a final rule that, among other things, postponed the compliance
dates to preserve the status quo for FGD wastewater and bottom ash transport
water by two years to November 2020 until the EPA amended the rule. On October
13, 2020, the EPA amended the 2015 ELG rule by: (i) altering the
42
--------------------------------------------------------------------------------
stringency of certain limits for FGD wastewater; (ii) relaxing the
zero-discharge requirement for bottom ash transport water; and (iii) changing
several deadlines. On July 26, 2021, the EPA announced that it is initiating a
new rulemaking to evaluate revising the ELG rule. While the EPA is developing
the new rule, the existing rule (as amended in 2020) will stay in place, and the
EPA expects permitting authorities to continue to implement the current
regulation. The EPA anticipates releasing a proposed rule in fall 2022. In
October 2021, NRG informed its regulators that the Company intends to comply
with the ELG by ceasing combustion of coal by the end of 2028 at its domestic
coal units outside of Texas, and installing appropriate controls by the end of
2025 at its two plants in Texas.
Regional Environmental Developments
Ash Regulation in Illinois - On July 30, 2019, Illinois enacted legislation that
requires the state to promulgate regulations regarding coal ash at surface
impoundments. On April 15, 2021, the state promulgated the implementing
regulation, which became effective on April 21, 2021. The new regulation
requires NRG to apply for initial operating permits for its coal ash surface
impoundments by October 31, 2021 and construction permits (for closure) starting
in 2022.
Significant Events
The following significant events have occurred during 2022 as further described
within this Management's Discussion and Analysis and the condensed consolidated
financial statements:
W.A. Parish Extended Outage
In May 2022, W.A. Parish Unit 8 came offline as a result of damage to certain
components of the steam turbine/generator. Based on management's current
assessment of necessary restoration efforts, the Company is targeting to return
the unit to service by the end of the second quarter of 2023.
Retirement of Joliet
During the second quarter of 2022, the results of the PJM Base Residual Auction
for the 2023/2024 delivery year were released leading the Company to revise its
long-term view of certain facilities and announce the planned retirement of the
Joliet generating facility in May 2023. Impairment losses of $20 million and
$130 million were recorded on the PJM generating assets and Midwest Generation
goodwill, respectively.
ERCOT Securitization Proceeds
During 2021, the Texas Legislature passed HB 4492 for ERCOT to mitigate
exceptionally high price adders and ancillary service costs incurred by LSEs
during Winter Storm Uri. HB 4492 authorized ERCOT to obtain $2.1 billion of
financing to distribute to LSEs that were charged and paid to ERCOT those highly
priced ancillary service and ORDPA during Winter Storm Uri. In December 2021,
the Company accounted for the proceeds as a reduction to cost of operations
within its consolidated statements of operations in the 2021 annual period for
which the proceeds were intended to compensate. The Company received proceeds of
$689 million from ERCOT in June 2022.
Sale of Watson
On June 1, 2022, the Company closed on the sale of its 49% ownership in the
Watson natural gas generating facility to Tesoro Refining & Marketing Company
LLC for $59 million. NRG recognized a gain on the sale of $46 million.
Share Repurchases
In December 2021, the Company's board of directors authorized the Company to
repurchase $1.0 billion of its common stock, of which $44 million was completed
in 2021. During the six months ended June 30, 2022, the Company completed $361
million of share repurchases at an average price of $39.48 per share, including
$6 million of equivalent shares purchased in lieu of tax withholdings on equity
compensation issuances.
Dividend Increase
In the first quarter of 2022, NRG increased the annual dividend to $1.40 from
$1.30 per share, representing an 8% increase from 2021. The Company expects to
target an annual dividend growth rate of 7-9% per share in subsequent years.
Renewable Power Purchase Agreements
The Company's strategy is to procure mid to long-term generation through power
purchase agreements. As of June 30, 2022, NRG has entered into PPAs totaling
approximately 2.4 GW with third-party project developers and other
counterparties, of which approximately 41% are operational. The average tenor of
these agreements is twelve years. The Company expects to continue evaluating and
executing similar agreements that support the needs of the business. The total
GW procured through PPAs may be impacted by contract terminations when they
occur.
43
--------------------------------------------------------------------------------
Limestone Unit 1 Return to Service
In early July 2021, Limestone Unit 1 came offline as a result of damage to the
duct work associated with the FGD system. The extended forced outage ended in
April of 2022 and the unit has returned to service.
COVID-19
While the pandemic presents risks to the Company's business, as further
described in the Company's 2021 Form 10-K in Part II, Item 1A - Risk Factors,
there was not a material adverse impact on the Company's results of operations
for the six months ended June 30, 2022 and 2021.
Trends Affecting Results of Operations and Future Business Performance
The Company's trends are described in the Company's 2021 Form 10-K in Item 7,
Management's Discussion and Analysis of Financial Condition and Results of
Operations - Business Environment.
Changes in Accounting Standards
See Note 2, Summary of Significant Accounting Policies, for a discussion of
recent accounting developments.
44
--------------------------------------------------------------------------------