NTPC Limited announced that Unit-1 (660 MW) of Barh Super Thermal Power Station Stage-I (3x660 MW) is declared on Commercial Operation with effective from 12 November 2021. With this, the commercial capacity of NTPC and NTPC group will become 54232.5 MW and 67657.5 MW respectively.