OKEA ASA announced that following damage to parts of the press pipe system at the Yme field, Repsol Norge AS, as operator, has informed OKEA ASA that the technical issues will likely result in a total of five to six weeks of production down-time at the field during third quarter of 2022 as repair work is being conducted. Estimated re-start of production is in early October 2022. The reduced production in third quarter of 2022 will not result in any change of OKEA's production guidance for the year.