Ora Banda Mining Limited announced the first results returned from the 2019 Riverina Phase 1 RC resource definition drilling program. Drilling (totaling 6,200 meters) continues to progress well with the initial Riverina Phase 1 RC program now 90% complete. Samples from this program being progressively analyzed with Batch 1 results received to date. Results from the Phase 1 program continue to build on the early drilling conducted between 2016 and 2018 which included hole RVDD16018 that returned 11.2 m @ 22.4 g/t from 64.2 meters . The Company's RC drilling focus will shift to the Waihi open pit mining area on completion of the Riverina Phase 1 program. Highlights includes: Significant high-grade results returned from Riverina 2019 Phase 1 resource definition drilling. Riverina is a large multiple lode system located 48 km from the Davyhurst Processing Plant with potential to host substantial open pit and underground mining operations. Shallow high grade intersections continue to enhance mining potential of Riverina. Outstanding result returned 6.0 m @ 13.4 g/t (including 2.0 m @ 11.4 g/t). Also 4.0 m @ 6.2 g/t (including 2.0 m @ 11.4 g/t). Also 5.0 m @ 4.1 g/t (including 2.0 m @ 7.9 g/t). The company is well-funded to continue an aggressive drilling program at Riverina.