Ora Banda Mining Limited announced the second set of results returned from the 2019 Riverina Phase 1 RC resource definition drilling program. The planned 6,200 metres Riverina Phase 1 RC drilling program is now complete and all samples from this program have now been logged and submitted for analysis. The RC drill rig has moved to the Waihi complex (3km from the Davyhurst processing plant) to continue the RC program in this area and is scheduled to return to Riverina following the return and integration of all the Phase 1 results into an updated mineralisation model. These results continue to build on results from earlier drilling (2016, 2018 and 2019) which include: hole RVDD16018 that returned 11.2m @ 22.4 g/t from 64.2 metres; and hole RVRC19019 that returned 6.0m @ 13.4 g/t from 65.0 metres.